A methodology for the development of delay mitigation measures in construction projects

被引:34
作者
Arantes, Amilcar [1 ]
Ferreira, Luis Miguel D. F. [2 ]
机构
[1] Univ Lisbon, Inst Super Tecn, Civil Engn Architecture & Georesources Dept, CERIS,CESUR, Ave Rovisco Pais, P-1049001 Lisbon, Portugal
[2] Univ Coimbra, Fac Sci & Technol, CeBER, Dept Mech Engn,CEMMPRE, Coimbra, Portugal
关键词
Construction industry; delay causes; mitigation measures; factor analysis; OPERATIONS MANAGEMENT; COST OVERRUNS; INSIGHTS; INDUSTRY;
D O I
10.1080/09537287.2020.1725169
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The aim of the present study is to present a methodology for the development of delay mitigation measures in construction projects. The proposed methodology, based on the identification of the underlying causes of delays and the stages of the construction project at which their observed causes take place, comprises four steps namely, questionnaire design, data collection, data analysis and development of delay mitigation measures in a focus group discussion. The application of this methodology in the Portuguese context, based on 94 surveys completed by clients, consultants and contractors, resulted in the identification of six underlying causes of delays in construction that were used to develop a set of mitigation measures. The results, on one hand, confirm the value of the methodology in helping to develop delay mitigation measures; on the other hand, they provide guidelines for the application of the methodology. Thus, this study contributes to the literature on project management by presenting an innovative methodology for the development of effective and practical delay mitigation measures in construction projects.
引用
收藏
页码:228 / 241
页数:14
相关论文
共 59 条
[1]   Understanding the planner's role in lookahead construction planning [J].
Abou-Ibrahim, Hisham ;
Hamzeh, Farook ;
Zankoul, Emile ;
Lindhard, Soren Munch ;
Rizk, Lynn .
PRODUCTION PLANNING & CONTROL, 2019, 30 (04) :271-284
[2]   Causes of delays in Saudi Arabian public sector construction projects [J].
Al-Kharashi, Adel ;
Skitmore, Martin .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2009, 27 (01) :3-23
[3]   Need for Alternative Research Approaches in Construction Management: Case of Delay Studies [J].
AlSehaimi, Abdullah ;
Koskela, Lauri ;
Tzortzopoulos, Patricia .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2013, 29 (04) :407-413
[4]   4P delays in project management [J].
Ansah, Richard Hannis ;
Sorooshian, Shahryar .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2018, 25 (01) :62-76
[5]   Is the construction industry aware of supply chain management? The Portuguese contractors' perspective [J].
Arantes, Amilcar ;
Ferreira, Luis Miguel D. F. ;
Costa, Antonio Aguiar .
SUPPLY CHAIN MANAGEMENT-AN INTERNATIONAL JOURNAL, 2015, 20 (04) :404-414
[6]  
Asiedu RO, 2017, CONSTR INNOV-ENGL, V17, P363, DOI 10.1108/CI-01-2016-0003
[7]   Causes of delay in large construction projects [J].
Construction Engineering and Management Department, King Fahd University of Petroleum and Minerals, Box # 680, Dhahran, 31261, Saudi Arabia .
Int. J. Proj. Manage., 2006, 4 (349-357) :349-357
[8]  
*BANC PORT, 2016, 126 VERBAR BANC PORT
[9]  
*BANC PORT, 2014, AN SET CONSTR
[10]  
Chai CS., 2015, Journal of Construction in Developing Countries, V20, P65