Causes of Delay in Construction Projects in the Oil and Gas Industry in the Gulf Cooperation Council Countries: A Case Study

被引:82
|
作者
Ruqaishi, Mohammed [1 ]
Bashir, Hamdi A. [2 ]
机构
[1] Tebodin & Partner LLC, Muscat, Oman
[2] Univ Sharjah, Dept Ind Engn & Management, Sharjah, U Arab Emirates
关键词
Delay time; Construction management; Oman; Case studies; Industrial facilities; Delay; Construction projects; Oil and gas industry; MANAGEMENT; RISK;
D O I
10.1061/(ASCE)ME.1943-5479.0000248
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Several studies investigating the causes of delay in projects in the construction industry have been conducted worldwide. This study investigates the causes of delay in construction projects in oil and gas processing facilities in Oman and serves as a case study for the Gulf Cooperation Council (GCC) countries. Using a questionnaire, data were collected from 59 project managers employed in different organizations in the oil and gas industry in Oman. The survey results showed a high degree of agreement among the perceptions of project stakeholders, clients, contractors, and consultants on the causes of project delay, and there is no evidence to suggest that the causes of project delay differ significantly according to organization size or organizational ownership. Moreover, seven factors were identified as the major causes of project delay. Although six of these identified elements are general factors that can account for delay in any project in any industry, one of thempoor interaction with vendors in the engineering and procurement stagesis found to be unique to construction projects in the oil and gas industry. The findings of this study could be of value to organizations that are planning to conduct construction projects for oil and gas processing facilities in Oman and other nations with similar environments, such as the GCC countries.
引用
收藏
页数:8
相关论文
共 40 条
  • [21] Collectively Designing CSR Through Meta-Organizations: A Case Study of the Oil and Gas Industry
    Berkowitz, Heloise
    Bucheli, Marcelo
    Dumez, Herve
    JOURNAL OF BUSINESS ETHICS, 2017, 143 (04) : 753 - 769
  • [22] Architectural reasoning in the conceptual phase - a case study in the oil and gas industry
    Engen, Siv
    Falk, Kristin
    Muller, Gerrit
    2019 14TH ANNUAL CONFERENCE SYSTEM OF SYSTEMS ENGINEERING (SOSE), 2019, : 87 - 92
  • [23] Diffusion of ERP in the Construction Industry: An ERP Modules Approach: Case Study of Developing Countries
    Boutros, Marie-Belle
    El Hajj, Claudette
    Jawad, Dima
    Montes, German Martinez
    BUILDINGS, 2024, 14 (10)
  • [24] Benefits of using IT systems in multi-sector projects: a case study of the Polish construction industry
    Waszkiewicz, Malgorzata
    Gumienny, Kamila
    KNOWLEDGE-BASED AND INTELLIGENT INFORMATION & ENGINEERING SYSTEMS (KSE 2021), 2021, 192 : 4269 - 4278
  • [25] Maintenance management system for upstream operations in oil and gas industry: A case study
    Wan Mahmood W.H.
    Ab Rahman M.N.
    Deros B.M.
    Mazli H.
    International Journal of Industrial and Systems Engineering, 2011, 9 (03) : 317 - 329
  • [26] Financial evaluation program for construction projects at the pre-investment phase in developing countries: A case study
    Halawa, Wael Said
    Abdelalim, Assem M. K.
    Abd Elrashed, Ibrahem
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2013, 31 (06) : 912 - 923
  • [27] Conceptual Model Analysis on Effects of Detain in Construction Industry by Identifying Various Causes - A Case Study
    Alami, Florance
    Krishnaraj, L.
    3RD INTERNATIONAL CONFERENCE ON ADVANCES IN MECHANICAL ENGINEERING (ICAME 2020), PTS 1-6, 2020, 912
  • [28] A framework for interactive risk assessment in projects: case study of oil and gas megaprojects in presence of sanctions
    Farahani, Amir Farmahini
    Didehkhani, Hosein
    Khalili-Damghani, Kaveh
    Sarfaraz, Amir Homayoun
    Hajirezaie, Mehdi
    JOURNAL OF MODELLING IN MANAGEMENT, 2022, 17 (02) : 569 - 600
  • [29] Exploring the Causes of Delays in Construction Industry Using a Cause-and-Effect Diagram: Case Study for Iran
    Abbasi, Omid
    Noorzai, Esmatullah
    Jafari, Kobra Gharouni
    Golabchi, Mahmood
    JOURNAL OF ARCHITECTURAL ENGINEERING, 2020, 26 (03)
  • [30] Key Performance Indicators for Operational Quality in the Oil and Gas Industry A Case Study Approach
    Onyemeh, N. C.
    Lee, C. W.
    Iqbal, M. A.
    2015 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2015, : 1417 - 1421