Development of quality improvement procedures and tools for facility management BIM

被引:30
|
作者
Leygonie, Romain [1 ]
Motamedi, Ali [1 ]
Iordanova, Ivanka [1 ]
机构
[1] Ecole Technol Super, Montreal, PQ, Canada
来源
DEVELOPMENTS IN THE BUILT ENVIRONMENT | 2022年 / 11卷
关键词
BIM; Facility management; Quality control; Quality assurance; Information requirements; INFORMATION; REQUIREMENTS;
D O I
10.1016/j.dibe.2022.100075
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Despite the potentially significant benefits that Building Information Modeling (BIM) can offer during a facility's operation and maintenance (O&M) phase, the construction industry has thus far mainly implemented BIM in the design and construction phases. This is because even though as-built BIM models are delivered at the handover stage, owners and operators rarely have the expertise to efficiently use and update them. Additionally, industry standards do not provide precise guidelines on aspects such as the ease of use, interoperability, and maintainability of FM-BIM, that could ensure their efficient and effective utilization. Moreover, given that these models are mainly developed for the design and construction phases, they usually contain design and construction details that are not useful for the building's operation and maintenance or lack information required for this phase. Thus, this paper investigates correspondences between as-built models and O&M requirements, using procedures and semi-automated tools to facilitate quality management activities for FM-BIM. To achieve this, a detailed checklist of items that are required in the BIM models at the handover stage and of the items that can be purged was created. This checklist is part of an overall quality framework that includes quality assurance and quality control tasks to deliver useable models for the operation and maintenance phase. Additionally, a procedure and a set of tools were investigated to semi-automatically apply a collection of the items of the checklist on as-built models. A process flow is presented to assist in quality management activities during the development of the models and to prepare them for handover. Finally, two case studies were conducted to verify and validate the applicability of the developed tools and proposed procedures.
引用
收藏
页数:16
相关论文
共 50 条
  • [41] BIM and Digital Tools for State-of-the-Art Construction Cost Management
    Sepasgozar, Samad M. E.
    Costin, Aaron M.
    Karimi, Reyhaneh
    Shirowzhan, Sara
    Abbasian, Ezatollah
    Li, Jinyun
    BUILDINGS, 2022, 12 (04)
  • [42] Implementation of Facility Management for Port Infrastructure through the Use of UAVs, Photogrammetry and BIM
    Jofre-Briceno, Constanza
    Munoz-La Rivera, Felipe
    Atencio, Edison
    Herrera, Rodrigo F.
    SENSORS, 2021, 21 (19)
  • [43] Building Information Modelling (BIM) in Facilities Management: Opportunities to be considered by Facility Managers
    Aziz, Nor Diana
    Nawawi, Abdul Hadi
    Ariff, Nor Rima Muhamad
    AMER INTERNATIONAL CONFERENCE ON QUALITY OF LIFE: QUALITY OF LIFE IN THE BUILT & NATURAL ENVIRONMENT 4 (AICQOL2016MEDAN), 2016, 234 : 353 - 362
  • [44] Smart Facility Management System Based on Open BIM and Augmented Reality Technology
    Chung, Suwan
    Cho, Chung-Suk
    Song, Jinwoo
    Lee, Kyuhyup
    Lee, Seojoon
    Kwon, Soonwook
    APPLIED SCIENCES-BASEL, 2021, 11 (21):
  • [45] Dynamic Data Feeding into BIM for Facility Management: A Prototype Application to a University Building
    Moreno, Jonatan Villavicencio
    Machete, Rita
    Falcao, Ana Paula
    Goncalves, Alexandre B.
    Bento, Rita
    BUILDINGS, 2022, 12 (05)
  • [46] The Development of an Automated System for a Quality Evaluation of Engineering BIM Models: A Case Study
    Valinejadshoubi, Mojtaba
    Moselhi, Osama
    Iordanova, Ivanka
    Valdivieso, Fernando
    Shakibabarough, Azin
    Bagchi, Ashutosh
    APPLIED SCIENCES-BASEL, 2024, 14 (08):
  • [47] BIM for CREM: Exploring the Benefit of Building Information Modelling for Facility Management in Corporate Real Estate Management
    Benn, Maximilian
    Stoy, Christian
    BUILDINGS, 2022, 12 (04)
  • [48] Quality assurance procedures for the neutron beam monitors at the FiR 1 BNCT facility
    Auterinen, I
    Serén, T
    Kotiluoto, P
    Uusi-Simola, J
    Savolainen, S
    APPLIED RADIATION AND ISOTOPES, 2004, 61 (05) : 1015 - 1019
  • [49] Trends in Adopting BIM, IoT and DT for Facility Management: A Scientometric Analysis and Keyword Co-Occurrence Network Review
    Siccardi, Stefania
    Villa, Valentina
    BUILDINGS, 2023, 13 (01)
  • [50] Identification of the Best 3D Viewpoint within the BIM Model: Application to Visual Tasks Related to Facility Management
    Neuville, Romain
    Pouliot, Jacynthe
    Billen, Roland
    BUILDINGS, 2019, 9 (07)