Development of quality improvement procedures and tools for facility management BIM

被引:30
|
作者
Leygonie, Romain [1 ]
Motamedi, Ali [1 ]
Iordanova, Ivanka [1 ]
机构
[1] Ecole Technol Super, Montreal, PQ, Canada
来源
DEVELOPMENTS IN THE BUILT ENVIRONMENT | 2022年 / 11卷
关键词
BIM; Facility management; Quality control; Quality assurance; Information requirements; INFORMATION; REQUIREMENTS;
D O I
10.1016/j.dibe.2022.100075
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Despite the potentially significant benefits that Building Information Modeling (BIM) can offer during a facility's operation and maintenance (O&M) phase, the construction industry has thus far mainly implemented BIM in the design and construction phases. This is because even though as-built BIM models are delivered at the handover stage, owners and operators rarely have the expertise to efficiently use and update them. Additionally, industry standards do not provide precise guidelines on aspects such as the ease of use, interoperability, and maintainability of FM-BIM, that could ensure their efficient and effective utilization. Moreover, given that these models are mainly developed for the design and construction phases, they usually contain design and construction details that are not useful for the building's operation and maintenance or lack information required for this phase. Thus, this paper investigates correspondences between as-built models and O&M requirements, using procedures and semi-automated tools to facilitate quality management activities for FM-BIM. To achieve this, a detailed checklist of items that are required in the BIM models at the handover stage and of the items that can be purged was created. This checklist is part of an overall quality framework that includes quality assurance and quality control tasks to deliver useable models for the operation and maintenance phase. Additionally, a procedure and a set of tools were investigated to semi-automatically apply a collection of the items of the checklist on as-built models. A process flow is presented to assist in quality management activities during the development of the models and to prepare them for handover. Finally, two case studies were conducted to verify and validate the applicability of the developed tools and proposed procedures.
引用
收藏
页数:16
相关论文
共 50 条
  • [31] INTEGRATING BUILDING INFORMATION MODELING (BIM) AND SENSOR TECHNOLOGY FOR FACILITY MANAGEMENT
    Kazado, Daniel
    Kavgic, Miroslava
    Eskicioglu, Rasit
    JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2019, 24 : 440 - 458
  • [32] FACILITY MANAGEMENT USING DIGITAL OBEYA ROOM BY INTEGRATING BIM-LEAN APPROACHES - AN EMPIRICAL STUDY
    de Matzos Nascimento, Daniel Luiz
    Goncalves Quelhas, Osvaldo Luiz
    Meirino, Marcelo Jasmim
    Gusmao Caiado, Rodrigo Goyannes
    Barbosa, Simone D. J.
    Ivson, Paulo
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2018, 24 (08) : 581 - 591
  • [33] Improving Quality and Performance of Facility Management Using Building Information Modelling
    Chong, Heap-Yih
    Wang, Jun
    Shou, Wenchi
    Wang, Xiangyu
    Guo, Jun
    COOPERATIVE DESIGN, VISUALIZATION, AND ENGINEERING, CDVE 2014, 2014, 8683 : 44 - 50
  • [34] Quality Management in Healthcare: Assessment Tools in Clinical Diagnostic Laboratories
    Kalra, Jawahar
    Nayar, Ajay
    Nogier, Karen
    Kopargaonkar, Ashish
    ADVANCES IN SAFETY MANAGEMENT AND HUMAN FACTORS (AHFE 2018), 2019, 791 : 91 - 97
  • [35] Asset Information Model Management-Based GIS/BIM Integration in Facility Management Contract
    Ismaeil, Esam M. H.
    SUSTAINABILITY, 2024, 16 (06)
  • [36] A Simplified Suggested Methodology for Quality Improvement in Radiation Oncology Facility
    Abbasi, Ahmed Nadeem
    Karim, Muneeb Uddin
    Qureshi, Bilal Mazhar
    TURK ONKOLOJI DERGISI-TURKISH JOURNAL OF ONCOLOGY, 2018, 33 (03): : 125 - 127
  • [37] Development of BIM Execution Plan for BIM Model Management during the Pre-Operation Phase: A Case Study
    Lin, Yu-Cheng
    Chen, Yen-Pei
    Huang, Wan-Ting
    Hong, Chia-Chun
    BUILDINGS, 2016, 6 (01)
  • [38] Continuous quality improvement in dialysis units: Basic tools
    McClellan, WM
    Goldman, RS
    ADVANCES IN RENAL REPLACEMENT THERAPY, 2001, 8 (02): : 95 - 103
  • [39] BIM Maintenance System with IoT Integration: Enhancing Building Performance and Facility Management
    Ehab, Ahmed
    Mahdi, Mazkour A.
    El-Helloty, Arfa
    CIVIL ENGINEERING JOURNAL-TEHRAN, 2024, 10 (06): : 1953 - 1973
  • [40] The use of a BIM-based framework to support safe facility management processes
    Wetzel, Eric M.
    Thabet, Walid Y.
    AUTOMATION IN CONSTRUCTION, 2015, 60 : 12 - 24