Development of quality improvement procedures and tools for facility management BIM

被引:30
|
作者
Leygonie, Romain [1 ]
Motamedi, Ali [1 ]
Iordanova, Ivanka [1 ]
机构
[1] Ecole Technol Super, Montreal, PQ, Canada
来源
DEVELOPMENTS IN THE BUILT ENVIRONMENT | 2022年 / 11卷
关键词
BIM; Facility management; Quality control; Quality assurance; Information requirements; INFORMATION; REQUIREMENTS;
D O I
10.1016/j.dibe.2022.100075
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Despite the potentially significant benefits that Building Information Modeling (BIM) can offer during a facility's operation and maintenance (O&M) phase, the construction industry has thus far mainly implemented BIM in the design and construction phases. This is because even though as-built BIM models are delivered at the handover stage, owners and operators rarely have the expertise to efficiently use and update them. Additionally, industry standards do not provide precise guidelines on aspects such as the ease of use, interoperability, and maintainability of FM-BIM, that could ensure their efficient and effective utilization. Moreover, given that these models are mainly developed for the design and construction phases, they usually contain design and construction details that are not useful for the building's operation and maintenance or lack information required for this phase. Thus, this paper investigates correspondences between as-built models and O&M requirements, using procedures and semi-automated tools to facilitate quality management activities for FM-BIM. To achieve this, a detailed checklist of items that are required in the BIM models at the handover stage and of the items that can be purged was created. This checklist is part of an overall quality framework that includes quality assurance and quality control tasks to deliver useable models for the operation and maintenance phase. Additionally, a procedure and a set of tools were investigated to semi-automatically apply a collection of the items of the checklist on as-built models. A process flow is presented to assist in quality management activities during the development of the models and to prepare them for handover. Finally, two case studies were conducted to verify and validate the applicability of the developed tools and proposed procedures.
引用
收藏
页数:16
相关论文
共 50 条
  • [1] Integration of BIM Tools for the Facility Management of Railway Bridges
    Cavieres-Lagos, Sebastian
    La Rivera, Felipe Munoz
    Atencio, Edison
    Herrera, Rodrigo F.
    APPLIED SCIENCES-BASEL, 2024, 14 (14):
  • [2] Linking life cycle BIM data to a facility management system using Revit Dynamo
    Thabet, Walid
    Lucas, Jason
    Srinivasan, Sai
    ORGANIZATION TECHNOLOGY AND MANAGEMENT IN CONSTRUCTION, 2022, 14 (01): : 2539 - 2558
  • [3] Decoding BIM Challenges in Facility Management Areas: A Stakeholders' Perspective
    Gordo-Gregorio, Paula
    Alavi, Hamidreza
    Forcada, Nuria
    BUILDINGS, 2025, 15 (05)
  • [4] BIM for Facility Management: Challenges and Research Gaps
    Naghshbandi, S. Neda
    CIVIL ENGINEERING JOURNAL-TEHRAN, 2016, 2 (12): : 679 - 684
  • [5] Quality control and quality assurance procedures at the THOR BNCT facility
    Liu, Yuan-Hao
    Tsai, Pi-En
    Lin, Yi-Chun
    Huang, Chun-Kai
    Liu, Hong-Ming
    Jiang, Shiang-Huei
    APPLIED RADIATION AND ISOTOPES, 2011, 69 (12) : 1897 - 1900
  • [6] Development and application of a specification-compliant highway tunnel facility management system based on BIM
    Chen, Lijuan
    Shi, Peixin
    Tang, Qiang
    Liu, Wei
    Wu, Qinglin
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2020, 97
  • [7] Existing assets maintenance management: Optimizing maintenance procedures and costs through BIM tools
    Salzano, Antonio
    Parisi, Claudia Mariaserena
    Acampa, Giovanna
    Nicolella, Maurizio
    AUTOMATION IN CONSTRUCTION, 2023, 149
  • [8] BIM Enabled Sustainable Facility Management
    Rahman, Md Motiar
    INTERNATIONAL JOURNAL OF INTEGRATED ENGINEERING, 2021, 13 (07): : 101 - 107
  • [9] MRI quality control tools for procedures and analyses
    Di Nallo, AM
    Ortenzia, O
    D'Arienzo, M
    Coniglio, D
    Benassi, M
    JOURNAL OF EXPERIMENTAL & CLINICAL CANCER RESEARCH, 2006, 25 (01) : 121 - 127
  • [10] BIM Facility Management on Utility tunnel
    Szu-Min Kang
    Yayu Tseng
    and Richard Moh
    办公自动化, 2014, (S1) : 174 - 177