共 15 条
[1]
Biostrateg, 2016, 22989501NCBR2016 BIO
[3]
Cycle Time Reduction in Deck Roller Assembly Production Unit with Value Stream Mapping Analysis
[J].
RECENT ADVANCES IN INFORMATION SYSTEMS AND TECHNOLOGIES, VOL 3,
2017, 571
:509-518
[5]
Statistical Approach to Making Decisions in Manufacturing Process of Floorboard
[J].
RECENT ADVANCES IN INFORMATION SYSTEMS AND TECHNOLOGIES, VOL 3,
2017, 571
:499-508
[6]
ECONOMIC ANALYSIS OF UPPER LAYER PRODUCTION OF ENGINEERED FLOORINGS
[J].
DREWNO,
2013, 56 (189)
:115-126
[7]
Patalas-Maliszewska J, 2017, FOUND MANAGE, V9, P149, DOI 10.1515/fman-2017-0012
[8]
Possibilities and Limitations of Passive Experiments Conducted in Industrial Conditions
[J].
ADVANCES IN MANUFACTURING (MANUFACTURING 2017),
2018,
:869-879
[9]
Sedlar T, 2010, DRVNA IND, V61, P111