Fuzzy adaptive genetic algorithm for multi-objective assembly line balancing problems

被引:53
|
作者
Alavidoost, M. H. [1 ]
Tarimoradi, Mosahar [1 ]
Zarandi, M. H. Fazel [1 ,2 ]
机构
[1] Amirkabir Univ Technol, Dept Ind Engn, Computat Intelligent Syst Lab, Tehran, Iran
[2] Univ Toronto, Knowledge Intelligent Syst Lab, Toronto, ON, Canada
关键词
Assembly line balancing; Adaptive genetic algorithm; Evolutionary operators; Fuzzy numbers; Fuzzy controller; One-Fifth Success Rule; SIMULATED ANNEALING ALGORITHM; MODEL; TIME; CLASSIFICATION; OPTIMIZATION; STRAIGHT; DESIGN;
D O I
10.1016/j.asoc.2015.06.001
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper aims at multi-objective straight and U-shaped assembly line balancing problems with the fuzzy task processing times. The problems are referred to herein as f-SALBP and f-SULBP and the objectives that are considered to be satisfied are: (a) minimizing the numbers of stations, (b) maximizing the fuzzy line efficiency, (c) minimizing the fuzzy idleness percentage, and (d) minimizing the fuzzy smoothness index. In fact, the f-SALBP and f-SULBP are SALBP and SULBP generalization in fuzzy circumstance, respectively. Initially, the two problems are formulated and due to the uncertainty, variability and imprecision that often occurred in real-world production systems, the processing time of tasks are supposed as triangular fuzzy numbers. Then, to solve the problem, a hybrid multi-objective genetic algorithm is proposed. A One-Fifth Success Rule (OFSR) is deployed for the selection and mutation operators to improve the genetic algorithm's performance. The results in the genetic algorithm are being controlled in convergence and diversity simultaneously by means of controlling the selective pressure (SP) and mutation rate. Likewise, a fuzzy controller to SP is employed for the OFSR toward a better implementation of the genetic algorithm. In addition, the Taguchi design of experiments is used for parameter control and calibration. Finally, the numerical examples are presented to compare the performance of the proposed method with the existing ones. The results show significantly better performance for the proposed algorithm. (C) 2015 Elsevier B.V. All rights reserved.
引用
收藏
页码:655 / 677
页数:23
相关论文
共 50 条
  • [1] A New Multi-Objective Genetic Algorithm for Assembly Line Balancing
    Li, S.
    Butterfield, J.
    Murphy, A.
    JOURNAL OF COMPUTING AND INFORMATION SCIENCE IN ENGINEERING, 2023, 23 (03)
  • [2] Multi-objective fuzzy assembly line balancing using genetic algorithms
    Zacharia, P. Th.
    Nearchou, Andreas C.
    JOURNAL OF INTELLIGENT MANUFACTURING, 2012, 23 (03) : 615 - 627
  • [3] Multi-objective fuzzy assembly line balancing using genetic algorithms
    P. Th. Zacharia
    Andreas C. Nearchou
    Journal of Intelligent Manufacturing, 2012, 23 : 615 - 627
  • [4] A multi-objective genetic algorithm for solving assembly line balancing problem
    Ponnambalam, SG
    Aravindan, P
    Naidu, GM
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2000, 16 (05): : 341 - 352
  • [5] A Multi-Objective Genetic Algorithm for Solving Assembly Line Balancing Problem
    S. G. Ponnambalam
    P. Aravindan
    G. Mogileeswar Naidu
    The International Journal of Advanced Manufacturing Technology, 2000, 16 : 341 - 352
  • [6] Multi-objective Assembly Line Balancing Using Fuzzy Inertia-adaptive Particle Swarm Algorithm
    Dinu, Simona
    STUDIES IN INFORMATICS AND CONTROL, 2015, 24 (03): : 283 - 292
  • [7] A note on "A multi-objective genetic algorithm for solving assembly line balancing problem"
    Fathi, Masood
    Ariffin, M. K. A.
    Ismail, Napsiah
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 50 (5-8): : 771 - 773
  • [8] A note on “A multi-objective genetic algorithm for solving assembly line balancing problem”
    Masood Fathi
    M. K. A. Ariffin
    Napsiah Ismail
    The International Journal of Advanced Manufacturing Technology, 2010, 50 : 771 - 773
  • [9] A multi-objective genetic-tabu algorithm for the assembly line balancing problem
    Zhang, YN
    Kan, SL
    Wang, Y
    PROCEEDINGS OF THE 11TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2: INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT IN THE GLOBAL ECONOMY, 2005, : 735 - 738
  • [10] Multi-Objective Assembly Line Balancing Problem with Setup Times Using Fuzzy Goal Programming and Genetic Algorithm
    Lee, Amy H. I.
    Kang, He-Yau
    Chen, Chong-Lin
    SYMMETRY-BASEL, 2021, 13 (02): : 1 - 28