共 44 条
[3]
Total tardiness minimization on unrelated parallel machine scheduling with auxiliary equipment constraints
[J].
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE,
2006, 34 (01)
:81-89
[5]
COLELLO RJ, 1995, J NEUROSCI, V15, P7665
[6]
COLELLO RJ, 1994, J NEUROSCI, V14, P2594
[10]
FORAN DR, 1992, J NEUROSCI, V12, P4890