The Application of the Process Control in the Construction of the Logistics Center

被引:0
作者
Zhang, Wei [1 ]
Liu, Zaiming [1 ]
机构
[1] Cent S Univ, Sch Math & Comp Technol, Changsha, Hunan, Peoples R China
来源
2011 INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND NETWORK TECHNOLOGY (ICCSNT), VOLS 1-4 | 2012年
关键词
logistics engineering; logistics center; process control; barreir strategy(BS); expected total loss;
D O I
暂无
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
The construction of the logistics center is very important. To consider this question, we put forward a new idea on how to determine the capacity of the logistics center. Through the discussion of the input flow and the output flow, we give the method to determine the capacity of the logistics center in two different cases: goods easy to spoilage and not easy to spoilage. As an illustration, we give an example.
引用
收藏
页码:2583 / 2586
页数:4
相关论文
共 7 条
[1]   Russian and American put options under exponential phase-type Levy models [J].
Asmussen, S ;
Avram, F ;
Pistorius, MR .
STOCHASTIC PROCESSES AND THEIR APPLICATIONS, 2004, 109 (01) :79-111
[2]  
Bertoin J., 1996, Levy Processes
[3]  
De Finetti B., 1957, T 15 INT C ACT, V2, P433
[4]  
Gerber HU., 1998, North Amer-ican Actuarial Journal, V2, P48, DOI [10.1080/10920277.1998.10595671, DOI 10.1080/10920277.1998.10595671]
[5]  
Prabhu N.U., 1980, STOCHASTIC STORAGE P
[6]  
SATO K., 2013, Cambridge Studies in Advanced Mathematics, V68
[7]   On the time to ruin and the deficit at ruin in a risk model with double-sided jumps [J].
Xing, Xiaoyu ;
Zhang, Wei ;
Jiang, Yiming .
STATISTICS & PROBABILITY LETTERS, 2008, 78 (16) :2692-2699