On the approximability of average completion time scheduling under precedence constraints

被引:39
作者
Woeginger, GJ
机构
[1] Graz Tech Univ, Inst Math, A-8010 Graz, Austria
[2] Univ Twente, Dept Math, NL-7500 AE Enschede, Netherlands
关键词
scheduling; precedence constraints; interval order; bipartite order; approximation algorithms; approximability threshold;
D O I
10.1016/S0166-218X(02)00427-4
中图分类号
O29 [应用数学];
学科分类号
070104 ;
摘要
We consider the scheduling problem of minimizing the average weighted job completion time on a single machine under precedence constraints. We show that this problem with arbitrary job weights, the special case of the problem where all job weights are one, and several other special cases of the problem all have the same approximability threshold with respect to polynomial time approximation algorithms. Moreover, for the special case of interval order precedence constraints and for the special case of convex bipartite precedence constraints, we give a polynomial time approximation algorithm with worst case performance guarantee arbitrarily close to the golden ratio 1/2 (1 + root5) approximate to 1.61803. (C) 2003 Elsevier B.V. All rights reserved.
引用
收藏
页码:237 / 252
页数:16
相关论文
共 17 条
[1]   Precedence constrained scheduling to minimize sum of weighted completion times on a single machine [J].
Chekuri, C ;
Motwani, R .
DISCRETE APPLIED MATHEMATICS, 1999, 98 (1-2) :29-38
[2]   A half-integral linear programming relaxation for scheduling precedence-constrained jobs on a single machine [J].
Chudak, FA ;
Hochbaum, DS .
OPERATIONS RESEARCH LETTERS, 1999, 25 (05) :199-204
[3]   FORMULATING THE SINGLE-MACHINE SEQUENCING PROBLEM WITH RELEASE DATES AS A MIXED INTEGER-PROGRAM [J].
DYER, ME ;
WOLSEY, LA .
DISCRETE APPLIED MATHEMATICS, 1990, 26 (2-3) :255-270
[4]   Two-dimensional Gantt charts and a scheduling algorithm of Lawler [J].
Goemans, MX ;
Williamson, DP .
SIAM JOURNAL ON DISCRETE MATHEMATICS, 2000, 13 (03) :281-294
[5]  
Graham R. L., 1979, Discrete Optimisation, P287
[6]   Scheduling to minimize average completion time: Off-line and on-line approximation algorithms [J].
Hall, LA ;
Schulz, AS ;
Shmoys, DB ;
Wein, J .
MATHEMATICS OF OPERATIONS RESEARCH, 1997, 22 (03) :513-544
[7]  
Lawler E.L., 1978, Annals of Discrete Mathematics, V2, P75
[8]  
Lawler E.L, 1993, HDB OPERATIONS RES M, V4, P445, DOI 10.1016/S0927-0507(05)80189-6
[9]   COMPLEXITY OF SCHEDULING UNDER PRECEDENCE CONSTRAINTS [J].
LENSTRA, JK ;
RINNOOYKAN, AHG .
OPERATIONS RESEARCH, 1978, 26 (01) :22-35
[10]  
MARGOT F, 1997, 200029 U KENT DEP MA