Mixed-integer linear programming models for the type-II resource-constrained assembly line balancing problem

被引:1
|
作者
Michels, Adalberto Sato [1 ]
Costa, Alysson M. [1 ]
机构
[1] Univ Melbourne, Sch Math & Stat, Melbourne, Vic, Australia
基金
澳大利亚研究理事会;
关键词
Assembly line balancing; Resource constraints; Type-II problem; Mixed-integer linear programming; GENETIC ALGORITHM; DESIGN; CUTS;
D O I
10.1108/AA-10-2021-0140
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Purpose Resource-constrained assembly lines are widely found in industries that manufacture complex products. In such lines, tasks may require specific resources to be processed. Therefore, decisions on which tasks and resources will be assigned to each station must be made. When the number of available stations is fixed, the problem's main goal becomes the minimisation of cycle time (type-II version). This paper aims to explore this variant of the problem that lacks investigation in the literature. Design/methodology/approach In this paper, the authors propose mixed-integer linear programming (MILP) models to minimise cycle time in resource-constrained assembly lines, given a limited number of stations and resources. Dedicated and alternative resource types for tasks are considered in different scenarios. Findings Besides, past modelling decisions and assumptions are questioned. The authors discuss how they were leading to suboptimal solutions and offer a rectification. Practical implications The proposed models and data set fulfil more practical concerns by taking into account characteristics found in real-world assembly lines. Originality/value The proposed MILP models are applied to an existing data set, results are compared against a constraint programming model, and new optimal solutions are obtained. Moreover, a data set extension is proposed due to the simplicity of the current one and instances up to 70 tasks are optimally solved.
引用
收藏
页码:585 / 594
页数:10
相关论文
共 50 条
  • [1] Constraint programming model for resource-constrained assembly line balancing problem
    Hacı Mehmet Alakaş
    Mehmet Pınarbaşı
    Mustafa Yüzükırmızı
    Soft Computing, 2020, 24 : 5367 - 5375
  • [2] Constraint programming model for resource-constrained assembly line balancing problem
    Alakas, Haci Mehmet
    Pinarbasi, Mehmet
    Yuzukirmizi, Mustafa
    SOFT COMPUTING, 2020, 24 (07) : 5367 - 5375
  • [3] Balancing stochastic type-II assembly lines: chance-constrained mixed integer and constraint programming models
    Pinarbasi, Mehmet
    Alakas, Haci Mehmet
    ENGINEERING OPTIMIZATION, 2020, 52 (12) : 2146 - 2163
  • [4] The type E simple assembly line balancing problem: A mixed integer linear programming formulation
    Esmaeilbeigi, Rasul
    Naderi, Bahman
    Charkhgard, Parisa
    COMPUTERS & OPERATIONS RESEARCH, 2015, 64 : 168 - 177
  • [5] Information-Theoretic Abstractions for Resource-Constrained Agents via Mixed-Integer Linear Programming
    Larsson, Daniel T.
    Maity, Dipankar
    Tsiotras, Panagiotis
    PROCEEDINGS OF 2021 WORKSHOP ON COMPUTATION-AWARE ALGORITHMIC DESIGN FOR CYBER-PHYSICAL SYSTEMS (CAADCPS), 2021, : 1 - 6
  • [6] Comparison of mixed integer linear programming models for the resource-constrained project scheduling problem with consumption and production of resources
    Kone, Oumar
    Artigues, Christian
    Lopez, Pierre
    Mongeau, Marcel
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2013, 25 (1-2) : 25 - 47
  • [7] Comparison of mixed integer linear programming models for the resource-constrained project scheduling problem with consumption and production of resources
    Oumar Koné
    Christian Artigues
    Pierre Lopez
    Marcel Mongeau
    Flexible Services and Manufacturing Journal, 2013, 25 : 25 - 47
  • [8] General resource-constrained assembly line balancing problem: conjunction normal form based constraint programming models
    Hacı Mehmet Alakaş
    Soft Computing, 2021, 25 : 6101 - 6111
  • [9] General resource-constrained assembly line balancing problem: conjunction normal form based constraint programming models
    Alakas, Haci Mehmet
    SOFT COMPUTING, 2021, 25 (08) : 6101 - 6111
  • [10] RESOURCE-CONSTRAINED MIXED MODEL ASSEMBLY LINE BALANCING IN AN APPAREL COMPANY
    Gungor, Mahmut
    Agac, Saliha
    TEKSTIL VE KONFEKSIYON, 2014, 24 (04): : 405 - 412