MIP approaches for the integrated berth allocation and quay crane assignment and scheduling problem

被引:119
作者
Agra, Agostinho [1 ,2 ]
Oliveira, Maryse [1 ]
机构
[1] Univ Aveiro, Dept Math, Aveiro, Portugal
[2] Univ Aveiro, Ctr Res & Dev Math & Applicat, Aveiro, Portugal
关键词
Berth allocation; Quay crane scheduling; Mixed integer formulations; Branch and cut; Rolling horizon heuristic; CONTAINER TERMINALS; PLANNING PROBLEM; ALGORITHM; PORT; BRANCH; MODELS; TIME;
D O I
10.1016/j.ejor.2017.05.040
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper we consider an integrated berth allocation and quay crane assignment and scheduling problem motivated by a real case where a heterogeneous set of cranes is considered. A first mathematical model based on the relative position formulation (RPF) for the berth allocation aspects is presented. Then, a new model is introduced to avoid the big-M constraints included in the RPF. This model results from a discretization of the time and space variables. For the new discretized model several enhancements, such as valid inequalities, are introduced. In order to derive good feasible solutions, a rolling horizon heuristic (RHH) is presented. A branch and cut approach that uses the enhanced discretized model and incorporates the upper bounds provided by the RHH solution is proposed. Computational tests are reported to show (i) the quality of the linear relaxation of the enhanced models; (ii) the effectiveness of the exact approach to solve to optimality a set of real instances; and (iii) the scalability of the RHH based on the enhanced mathematical model which is able to provide good feasible solutions for large size instances. (C) 2017 Elsevier B.V. All rights reserved.
引用
收藏
页码:138 / 148
页数:11
相关论文
共 48 条
  • [1] Description of 2-integer continuous knapsack polyhedra
    Agra, A.
    Constantinob, M.
    [J]. DISCRETE OPTIMIZATION, 2006, 3 (02) : 95 - 110
  • [2] Lifting two-integer knapsack inequalities
    Agra, A.
    Constantino, M. F.
    [J]. MATHEMATICAL PROGRAMMING, 2007, 109 (01) : 115 - 154
  • [3] Ak A., 2008, THESIS
  • [4] The Quay Crane Scheduling Problem
    Al-Dhaheri, Noura
    Diabat, Ali
    [J]. JOURNAL OF MANUFACTURING SYSTEMS, 2015, 36 : 87 - 94
  • [5] [Anonymous], 2014, Review of Maritime Transport
  • [6] Scheduling cranes at an indented berth
    Beens, Marie-Anne
    Ursavas, Evrim
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 253 (02) : 298 - 313
  • [7] A follow-up survey of berth allocation and quay crane scheduling problems in container terminals
    Bierwirth, Christian
    Meisel, Frank
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 244 (03) : 675 - 689
  • [8] A survey of berth allocation and quay crane scheduling problems in container terminals
    Bierwirth, Christian
    Meisel, Frank
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 202 (03) : 615 - 627
  • [9] Berth and quay crane allocation: a moldable task scheduling model
    Blazewicz, J.
    Cheng, T. C. E.
    Machowiak, M.
    Oguz, C.
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2011, 62 (07) : 1189 - 1197
  • [10] A generalized classification scheme for crane scheduling with interference
    Boysen, Nils
    Briskorn, Dirk
    Meisel, Frank
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 258 (01) : 343 - 357