Evaluation of TBM Cutter Wear in Naghadeh Water Conveyance Tunnel and Developing a New Prediction Model

被引:36
作者
Barzegari, Ghodrat [1 ]
Khodayari, Jafar [1 ]
Rostami, Jamal [2 ]
机构
[1] Univ Tabriz, Fac Nat Sci, Dept Earth Sci, Tabriz, Iran
[2] Colorado Sch Mines, Earth Mech Inst, Dept Min Engn, Golden, CO 80401 USA
关键词
Hard rock; Mechanized tunneling; Disc cutter life; Cerchar; Abrasivity; SOIL ABRASIVITY; BORING MACHINE; CHALLENGES; ROCKS; LIFE; LINE;
D O I
10.1007/s00603-021-02640-7
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Replacing worn disc cutters in a tunnel boring machine (TBM) operation is a time-consuming and expensive process. This article presents the study of disc cutter wear rate during the excavation of 36 km Naqadeh water conveyance tunnel with a diameter of 6.325 m. The construction of this tunnel in northwest Iran has been recently completed. The geological setting of the tunnel consists of variable lithology, including limestone, shale, granite, and granodiorite units. Field data were collected and analyzed from TBM tunneling of 9.5 km of the tunnel. The analysis was performed by incorporating the types of wear and comparing the accuracy of traditional cutter wear prediction models. The new model was developed using statistical analysis of the observed cutter wear in this project. The validity of the proposed model was evaluated using the excavation data for the following 2 km of the tunnel. The model developed in this study allows estimating wear rate and cutter life using common rock characterization parameters such as the Cerchar abrasivity index (CAI) and the uniaxial compressive strength (UCS).
引用
收藏
页码:6281 / 6297
页数:17
相关论文
共 42 条
[1]  
Aghanabati A., 2004, Geology of Iran
[2]  
Altindag R, 2002, J S AFR I MIN METALL, V102, P61
[3]   Parametric study of soil abrasivity for predicting wear issue in TBM tunneling projects [J].
Barzegari, Ghodrat ;
Uromeihy, Ali ;
Zhao, Jian .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2015, 48 :43-57
[4]   EPB tunneling challenges in bouldery ground: a new experience on the Tabriz metro line 1, Iran [J].
Barzegari, Ghodrat ;
Uromeihy, Ali ;
Zhao, Jian .
BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2014, 73 (02) :429-440
[5]   A newly developed soil abrasion testing method for tunnelling using shield machines [J].
Barzegari, Ghodrat ;
Uromeihy, Ali ;
Zhao, Jian .
QUARTERLY JOURNAL OF ENGINEERING GEOLOGY AND HYDROGEOLOGY, 2013, 46 (01) :63-74
[6]  
Bruland A., 1998, HARD ROCK TUNNEL BOR
[7]  
Budinski KG, 2007, ASTM MAN SER, P1
[8]   Development of a new direct test method for estimating cutter life, based on the Sievers' J miniature drill test [J].
Dahl, Filip ;
Grov, Eivind ;
Breivik, Torkjell .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2007, 22 (01) :106-116
[9]  
Deketh H.J.R., 1998, Bulletin of Engineering Geology and the Environment, V57, P3, DOI DOI 10.1007/S100640050016
[10]   Tool wear in TBM hard rock drilling – backgrounds and special phenomena [J].
Ellecosta, Peter ;
Käsling, Heiko ;
Thuro, Kurosch .
Geomechanik und Tunnelbau, 2018, 11 (02) :142-148