Numerical simulation of freezing effect and tool change of shield machine with a frozen cutterhead

被引:9
作者
Dai, Wei [1 ,2 ]
Xia, Yi-min [1 ]
Xu, Hai-liang [1 ]
Yang, Mei [1 ]
机构
[1] Cent South Univ, Coll Mech & Elect Engn, Changsha 410083, Peoples R China
[2] China Railway 25th Bur Grp Co Ltd, Guangzhou 510600, Peoples R China
基金
国家高技术研究发展计划(863计划);
关键词
shield machine; construction; frozen cutterhead; tool change maintenance; finite element simulation; TEMPERATURE DISTRIBUTION; SOIL WALL; TESTS;
D O I
10.1007/s11771-020-4365-3
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
A shield machine with freezing function is proposed in order to realize tool change operation at atmospheric pressure. Furthermore, the transformation project of freezing cutterhead and tool change maintenance method are put forward. Taking the shield construction of Huanxi Power Tunnel as an example, a numerical analysis of the freezing cutter head of the project was carried out. The results show that when the brine temperature is -25 degrees C, after 30 d of freezing, the thickness of the frozen wall can reach 0.67 m and the average temperature drops to -9.9 degrees C. When the brine temperature is -30 degrees C, after 50 d of freezing, the thickness of the frozen wall can reach 1.01 m and the average temperature drops to -12.4 degrees C. If the thickness of the frozen wall is 0.5 m and the average temperature is -10 degrees C, as the design index of the frozen wall, the brine temperature should be lower than -28 degrees C to meet the excavation requirements in 30 d. Analyzing the frozen wall stress under 0.5 m thickness and -10 degrees C average temperature condition, the tensile safety factor and compressive safety factor are both greater than 2 at the most dangerous position, which can meet the tool change requirements for shield construction.
引用
收藏
页码:1262 / 1272
页数:11
相关论文
共 28 条
[1]   DEM Investigation of Particle-Scale Mechanical Properties of Frozen Soil Based on the Nonlinear Microcontact Model Incorporating Rolling Resistance [J].
An, Lingshi ;
Ling, Xianzhang ;
Geng, Yongchang ;
Li, Qionglin ;
Zhang, Feng .
MATHEMATICAL PROBLEMS IN ENGINEERING, 2018, 2018
[2]  
ANDERSLAND, 2011, FROZEN GROUND ENG
[3]   Empirical modeling for predicting excavation performance of EPB TBM based on soil properties [J].
Avunduk, Emre ;
Copur, Hanifi .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2018, 71 :340-353
[4]  
Brun B, 2006, NUMERICAL MODELLING OF CONSTRUCTION PROCESSES IN GEOTECHNICAL ENGINEERING FOR URBAN ENVIRONMENT, P225
[5]   Optimum spacing of TBM disc cutters: A numerical simulation using the three-dimensional dynamic fracturing method [J].
Cho, Jung-Woo ;
Jeon, Seokwon ;
Yu, Sang-Hwa ;
Chang, Soo-Ho .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2010, 25 (03) :230-244
[6]   Large-scale direct shear testing of compacted frozen soil under freezing and thawing conditions [J].
De Guzman, Earl Marvin B. ;
Stafford, Dylan ;
Alfaro, Marolo C. ;
Dore, Guy ;
Arenson, Lukas U. .
COLD REGIONS SCIENCE AND TECHNOLOGY, 2018, 151 :138-147
[7]   An application of rock engineering systems for estimating TBM downtimes [J].
Frough, Omid ;
Torabi, Seyed Rahman .
ENGINEERING GEOLOGY, 2013, 157 :112-123
[8]   Performance model for Micro Tunnelling Boring Machines (MTBM) [J].
Gallo, J. ;
Perez-Acebo, H. .
INFORMES DE LA CONSTRUCCION, 2017, 69 (546)
[9]   Disc cutting tests in Colorado red granite: Implications for TBM performance prediction [J].
Gertsch, R. ;
Gertsch, L. ;
Rostami, J. .
INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2007, 44 (02) :238-246
[10]   Parametric study of the impacts of various geological and machine parameters on thrust force requirements for operating a single shield TBM in squeezing ground [J].
Hasanpour, Rohola ;
Rostami, Jamal ;
Thewes, Markus ;
Schmitt, Juergen .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2018, 73 :252-260