Feasibility of object real-time transactions.

被引:0
作者
Misovic, M [1 ]
机构
[1] Mil Acad Brno, Dept Automated Command Syst & Informat, Brno 61200, Czech Republic
来源
MODELLING AND SIMULATION 2001 | 2001年
关键词
Object Cooperation Logic; elementary transaction feasibility; state logical equations; elementary object cooperation feasibility; path; path transaction feasibility; path object cooperation feasibility; functional correctness of a path; functional correctness of a complex transaction;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Generally, we can identify two types of industrial and military real-time systems. The first have hard deadlines that have to be met, otherwise a catastrophe can occur. The second - non hard systems which provide service in real-time but what is important, a catastrophe will not occur. We know that, the control of a modem aircraft combat we can regard as a typical example of the hard category, where as a digital computer system for mobile telephones is a typical example of the nonhard systems. By another words, time is very important for these two categories of systems. Imagine three working objects in times t(1), t(2) and t(3) according to next picture. [GRAPHICS] The sum of the times it takes for the objects to carry out their tasks must then be less or equal to the time associated with the sequence in the use case, Sigma (3)(i-1) t(i) less than or equal to t. We have to imply a realtime property to cooperation between two transactions. Using a progressive Information Technology for development of Software Modules for Information Systems brings a lot of practical and theoretical problems. One of them is a verification of results achieved in Life Cycle Stages. Object Oriented Analysis has the main position in the Object Life Cycle of Information Systems. It gives fundamental diagrams, which will be processed in the Design phase. Therefore, a testing of object complex transaction before their programming appears as very useful activity This article introduces a formal description of the Object Cooperation Logic. Therefore, there are defined three types of transaction feasibility. It enables to search the feasibility of certain strings of transactions and object collaborations. There are found two different systems of state logical equations and one system of time conditions. The first describes a path transaction feasibility, the second a path object cooperation feasibility and the third expresses real-time conditions for requirements.
引用
收藏
页码:173 / 176
页数:4
相关论文
共 50 条
[31]   An adaptive real-time NURBS curve interpolation for 4-axis polishing machine tool [J].
Ji, Shijun ;
Lei, Lianggen ;
Zhao, Ji ;
Lu, Xiuquan ;
Gao, Hong .
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2021, 67
[32]   Analysis and Implementation of Motion Planning Algorithms for Real-Time Navigation of Aerial Robots in Dynamic Environments [J].
Alqudsi, Yunes .
2024 4TH INTERNATIONAL CONFERENCE ON EMERGING SMART TECHNOLOGIES AND APPLICATIONS, ESMARTA 2024, 2024, :580-589
[33]   An enhanced weight-based real-time map matching algorithm for complex urban networks [J].
He, Mujun ;
Zheng, Linjiang ;
Cao, Wei ;
Huang, Jing ;
Liu, Xu ;
Liu, Weining .
PHYSICA A-STATISTICAL MECHANICS AND ITS APPLICATIONS, 2019, 534
[34]   A Practical Joint-space Trajectory Generation Method Based on Convolution in Real-time Control [J].
Yang, Gil Jin ;
Delgado, Raimarius ;
Choi, Byoung Wook .
INTERNATIONAL JOURNAL OF ADVANCED ROBOTIC SYSTEMS, 2016, 13
[35]   Map matching for low-sampling-rate GPS trajectories by exploring real-time moving directions [J].
Hsueh, Yu-Ling ;
Chen, Ho-Chian .
INFORMATION SCIENCES, 2018, 433 :55-69
[36]   Quadruple tripatch-wise modular architecture-based real-time structure from motion [J].
Bai, Ling ;
Li, Yinguo ;
Kirubarajan, Thia ;
Gao, Xinbo .
NEUROCOMPUTING, 2022, 480 :169-191
[37]   A Real-Time Model Predictive Controller for Power Control in Extended-Range Auxiliary Power Unit [J].
Ye, Jie ;
Feng, Han ;
Xiong, Wenyu ;
Gong, Qichangyi ;
Xu, Jinbang ;
Shen, Anwen .
IEEE TRANSACTIONS ON VEHICULAR TECHNOLOGY, 2021, 70 (11) :11419-11432
[38]   Real-time global action planning for unmanned ground vehicle exploration in Three-dimensional spaces [J].
Zuo, Xinkai ;
Zhou, Jian ;
Yang, Fan ;
Su, Fei ;
Zhu, Haihong ;
Li, Lin .
EXPERT SYSTEMS WITH APPLICATIONS, 2023, 215
[39]   Real-time Motion-planning of Curvature-constrained AUVs under Steady Ocean Currents [J].
Mittal, Khushboo ;
Song, Junnan ;
Gupta, Shalabh .
OCEANS 2019 MTS/IEEE SEATTLE, 2019,
[40]   Real-time local smoothing for five-axis linear toolpath considering smoothing error constraints [J].
Huang, Jie ;
Du, Xu ;
Zhu, Li-Min .
INTERNATIONAL JOURNAL OF MACHINE TOOLS & MANUFACTURE, 2018, 124 :67-79