RETRACTED: Complex multi-products dynamic scheduling algorithm with sequence-dependent setup times (Retracted Article)

被引:1
作者
Xie, Zhiqiang [1 ,2 ]
Lan, Lan [1 ]
Zhao, Lei [1 ]
Yang, Jing [2 ]
机构
[1] Harbin Univ Sci & Technol, Coll Comp Sci & Technol, Harbin, Peoples R China
[2] Harbin Engn Univ, Coll Comp Sci & Technol, Harbin, Peoples R China
来源
2ND IEEE INTERNATIONAL CONFERENCE ON ADVANCED COMPUTER CONTROL (ICACC 2010), VOL. 1 | 2010年
基金
中国博士后科学基金; 中国国家自然科学基金;
关键词
complex multi-products; setup times; integrated scheduling; algorithm; manufacturing tree;
D O I
10.1109/ICACC.2010.5486771
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The problem of considering the setup times in scheduling with non-sequence constraint between operations has been researched, but there are no researches on the problem of considering the setup times in processing and assembly integrated scheduling of complex multi-product dynamic scheduling with sequence constraint between operations. So, a complex multi-product dynamic scheduling algorithm is proposed, considering sequence-dependent setup times. The algorithm constructs the virtual manufacturing tree in the way of root alignment and converts the complex multi-product dynamic scheduling problem to the complex single product scheduling problem. After the scheduling sequence of operations is determined, the starting time of each operation is determined by dynamically inserting setup time once. As the (1) proposed algorithm avoids several movements of the scheduled operation when the setup time is inserted, the time complexity is sharply reduced. Theoretical analysis and examples show that the proposed algorithm not only can solve the complex multi-product dynamic scheduling problem with sequence-dependent setup times, but also is simple and practical.
引用
收藏
页码:19 / 24
页数:6
相关论文
共 50 条
[41]   A new hybridization of adaptive large neighborhood search with constraint programming for open shop scheduling with sequence-dependent setup times [J].
Abreu, Levi R. ;
Nagano, Marcelo S. .
COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 168
[42]   Evolving many-objective dispatching rule pairs for unrelated parallel machine scheduling with sequence-dependent setup times [J].
Zeng, Chuangfeng ;
Liu, Jianjun ;
Peng, Chengfeng ;
Chen, Qingxin .
ENGINEERING OPTIMIZATION, 2024, 56 (12) :2268-2289
[43]   Optimal control strategies for single-machine family scheduling with sequence-dependent batch setup and controllable processing times [J].
Giglio, Davide .
JOURNAL OF SCHEDULING, 2015, 18 (05) :525-543
[44]   Solution approaches for the parallel machine order acceptance and scheduling problem with sequence-dependent setup times, release dates and deadlines [J].
Bicakc, Papatya S. ;
Derya, Tusan ;
Kara, Imdat .
EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2021, 15 (03) :295-318
[45]   Iterated Local Search for single-machine scheduling with sequence-dependent setup times to minimize total weighted tardiness [J].
Xu, Hongyun ;
Lu, Zhipeng ;
Cheng, T. C. E. .
JOURNAL OF SCHEDULING, 2014, 17 (03) :271-287
[46]   The high performing backtracking algorithm and heuristic for the sequence-dependent setup times flowshop problem with total weighted tardiness [J].
Zheng, Jun-Xi ;
Zhang, Ping ;
Li, Fang ;
Du, Guang-Long .
ENGINEERING OPTIMIZATION, 2016, 48 (09) :1571-1592
[47]   An Iterated Local Search heuristic for the single machine total weighted tardiness scheduling problem with sequence-dependent setup times [J].
Subramanian, Anand ;
Battarra, Maria ;
Potts, Chris N. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (09) :2729-2742
[48]   Energy-aware production scheduling in the flow shop environment under sequence-dependent setup times, group scheduling and renewable energy constraints [J].
Ghorbanzadeh, Masoumeh ;
Ranjbar, Mohammad .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 307 (02) :519-537
[49]   Acceleration-based artificial bee colony optimizer for a distributed permutation flowshop scheduling problem with sequence-dependent setup times [J].
Yu, Yang ;
Zhang, Feng-Qi ;
Huang, Jiang -Ping .
APPLIED SOFT COMPUTING, 2023, 135
[50]   Scheduling with sequence-dependent setup times in short-term production planning: A main path analysis-based review [J].
Ying, Kuo-Ching ;
Pourhejazy, Pourya ;
Lin, Zhi-Rong .
OPERATIONS RESEARCH PERSPECTIVES, 2025, 14