RETRACTED: Complex multi-products dynamic scheduling algorithm with sequence-dependent setup times (Retracted Article)

被引:1
作者
Xie, Zhiqiang [1 ,2 ]
Lan, Lan [1 ]
Zhao, Lei [1 ]
Yang, Jing [2 ]
机构
[1] Harbin Univ Sci & Technol, Coll Comp Sci & Technol, Harbin, Peoples R China
[2] Harbin Engn Univ, Coll Comp Sci & Technol, Harbin, Peoples R China
来源
2ND IEEE INTERNATIONAL CONFERENCE ON ADVANCED COMPUTER CONTROL (ICACC 2010), VOL. 1 | 2010年
基金
中国国家自然科学基金; 中国博士后科学基金;
关键词
complex multi-products; setup times; integrated scheduling; algorithm; manufacturing tree;
D O I
10.1109/ICACC.2010.5486771
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The problem of considering the setup times in scheduling with non-sequence constraint between operations has been researched, but there are no researches on the problem of considering the setup times in processing and assembly integrated scheduling of complex multi-product dynamic scheduling with sequence constraint between operations. So, a complex multi-product dynamic scheduling algorithm is proposed, considering sequence-dependent setup times. The algorithm constructs the virtual manufacturing tree in the way of root alignment and converts the complex multi-product dynamic scheduling problem to the complex single product scheduling problem. After the scheduling sequence of operations is determined, the starting time of each operation is determined by dynamically inserting setup time once. As the (1) proposed algorithm avoids several movements of the scheduled operation when the setup time is inserted, the time complexity is sharply reduced. Theoretical analysis and examples show that the proposed algorithm not only can solve the complex multi-product dynamic scheduling problem with sequence-dependent setup times, but also is simple and practical.
引用
收藏
页码:19 / 24
页数:6
相关论文
共 50 条
[31]   A branch-and-price algorithm for scheduling parallel machines with sequence dependent setup times [J].
Pereira Lopes, Manuel J. ;
Valerio de Carvalho, J. M. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 176 (03) :1508-1527
[32]   Variable neighborhood search approaches for scheduling jobs on parallel machines with sequence-dependent setup times, precedence constraints, and ready times [J].
Driessel, Rene ;
Moench, Lars .
COMPUTERS & INDUSTRIAL ENGINEERING, 2011, 61 (02) :336-345
[33]   New Benchmark Algorithm for Minimizing Total Completion Time in blocking flowshops with sequence-dependent setup times [J].
Cheng, Chen-Yang ;
Pourhejazy, Pourya ;
Ying, Kuo-Ching ;
Huang, Shi-Yao .
APPLIED SOFT COMPUTING, 2021, 104
[34]   Flexible job shop scheduling with sequence-dependent setup and transportation times by ant colony with reinforced pheromone relationships [J].
Rossi, Andrea .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2014, 153 :253-267
[35]   Due-date scheduling on parallel machines with job splitting and sequence-dependent major/minor setup times [J].
Park, Taeho ;
Lee, Taehyung ;
Kim, Chang Ouk .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 59 (1-4) :325-333
[36]   A constraint programming approach to a real-world workforce scheduling problem for multi-manned assembly lines with sequence-dependent setup times [J].
Guner, Funda ;
Gorur, Abdul K. ;
Satir, Benhur ;
Kandiller, Levent ;
Drake, John H. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2024, 62 (09) :3212-3229
[37]   Local search and genetic algorithm for the job shop scheduling problem with sequence dependent setup times [J].
Vela, Camino R. ;
Varela, Ramiro ;
Gonzalez, Miguel A. .
JOURNAL OF HEURISTICS, 2010, 16 (02) :139-165
[38]   Local search and genetic algorithm for the job shop scheduling problem with sequence dependent setup times [J].
Camino R. Vela ;
Ramiro Varela ;
Miguel A. González .
Journal of Heuristics, 2010, 16 :139-165
[39]   A Cooperative Scatter Search With Reinforcement Learning Mechanism for the Distributed Permutation Flowshop Scheduling Problem With Sequence-Dependent Setup Times [J].
Zhao, Fuqing ;
Zhou, Gang ;
Wang, Ling .
IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2023, 53 (08) :4899-4911
[40]   A heuristic algorithm to minimize total weighted tardiness on a single machine with release dates and sequence-dependent setup times [J].
Chang, Tzu-Yun ;
Chou, Fuh-Der ;
Lee, Ching-En .
Journal of the Chinese Institute of Industrial Engineers, 2004, 21 (03) :289-300