RETRACTED: Complex multi-products dynamic scheduling algorithm with sequence-dependent setup times (Retracted Article)

被引:1
作者
Xie, Zhiqiang [1 ,2 ]
Lan, Lan [1 ]
Zhao, Lei [1 ]
Yang, Jing [2 ]
机构
[1] Harbin Univ Sci & Technol, Coll Comp Sci & Technol, Harbin, Peoples R China
[2] Harbin Engn Univ, Coll Comp Sci & Technol, Harbin, Peoples R China
来源
2ND IEEE INTERNATIONAL CONFERENCE ON ADVANCED COMPUTER CONTROL (ICACC 2010), VOL. 1 | 2010年
基金
中国博士后科学基金; 中国国家自然科学基金;
关键词
complex multi-products; setup times; integrated scheduling; algorithm; manufacturing tree;
D O I
10.1109/ICACC.2010.5486771
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The problem of considering the setup times in scheduling with non-sequence constraint between operations has been researched, but there are no researches on the problem of considering the setup times in processing and assembly integrated scheduling of complex multi-product dynamic scheduling with sequence constraint between operations. So, a complex multi-product dynamic scheduling algorithm is proposed, considering sequence-dependent setup times. The algorithm constructs the virtual manufacturing tree in the way of root alignment and converts the complex multi-product dynamic scheduling problem to the complex single product scheduling problem. After the scheduling sequence of operations is determined, the starting time of each operation is determined by dynamically inserting setup time once. As the (1) proposed algorithm avoids several movements of the scheduled operation when the setup time is inserted, the time complexity is sharply reduced. Theoretical analysis and examples show that the proposed algorithm not only can solve the complex multi-product dynamic scheduling problem with sequence-dependent setup times, but also is simple and practical.
引用
收藏
页码:19 / 24
页数:6
相关论文
共 50 条
[21]   A novel discrete water wave optimization algorithm for blocking flow-shop scheduling problem with sequence-dependent setup times [J].
Shao, Zhongshi ;
Pi, Dechang ;
Shao, Weishi .
SWARM AND EVOLUTIONARY COMPUTATION, 2018, 40 :53-75
[22]   An efficient algorithm for operation insertion in a multi-resource job-shop schedule with sequence-dependent setup times [J].
Artigues, C ;
Roubellat, F .
PRODUCTION PLANNING & CONTROL, 2002, 13 (02) :175-186
[23]   Efficient local search limitation strategy for single machine total weighted tardiness scheduling with sequence-dependent setup times [J].
Subramanian, Anand ;
Farias, Katyanne .
COMPUTERS & OPERATIONS RESEARCH, 2017, 79 :190-206
[24]   A linear programming approach for identical parallel machine scheduling with job splitting and sequence-dependent setup times [J].
Tahar, DN ;
Yalaoui, F ;
Chu, CB ;
Amodeo, L .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2006, 99 (1-2) :63-73
[25]   Scheduling uniform parallel dedicated machines with job splitting, sequence-dependent setup times, and multiple servers [J].
Kim, Hyun-Jung ;
Lee, Jun-Ho .
COMPUTERS & OPERATIONS RESEARCH, 2021, 126
[26]   A hybrid metaheuristic for the prize-collecting single machine scheduling problem with sequence-dependent setup times [J].
Wang, Xianpeng ;
Tang, Lixin .
COMPUTERS & OPERATIONS RESEARCH, 2010, 37 (09) :1624-1640
[27]   Integrated Working-Age Maintenance to the Unrelated Parallel Machine Scheduling with Sequence-Dependent Setup Times [J].
Gao, Jia ;
Wang, Yanhong ;
Zhang, Jun ;
Tan, Yuanyuan .
ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2024,
[28]   A hyper-heuristic for distributed parallel machine scheduling with machine-dependent processing and sequence-dependent setup times [J].
Behnamian, Javad ;
Asgari, Hamed .
RAIRO-OPERATIONS RESEARCH, 2022, 56 (06) :4129-4143
[29]   A matrix-cube-based estimation of distribution algorithm for blocking flow-shop scheduling problem with sequence-dependent setup times [J].
Zhang, Zi-Qi ;
Qian, Bin ;
Hu, Rong ;
Jin, Huai-Ping ;
Wang, Ling ;
Yang, Jian-Bo .
EXPERT SYSTEMS WITH APPLICATIONS, 2022, 205
[30]   A genetic algorithm for the unrelated parallel machine scheduling problem with sequence dependent setup times [J].
Vallada, Eva ;
Ruiz, Ruben .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 211 (03) :612-622