RETRACTED: Complex multi-products dynamic scheduling algorithm with sequence-dependent setup times (Retracted Article)

被引:1
|
作者
Xie, Zhiqiang [1 ,2 ]
Lan, Lan [1 ]
Zhao, Lei [1 ]
Yang, Jing [2 ]
机构
[1] Harbin Univ Sci & Technol, Coll Comp Sci & Technol, Harbin, Peoples R China
[2] Harbin Engn Univ, Coll Comp Sci & Technol, Harbin, Peoples R China
来源
2ND IEEE INTERNATIONAL CONFERENCE ON ADVANCED COMPUTER CONTROL (ICACC 2010), VOL. 1 | 2010年
基金
中国国家自然科学基金; 中国博士后科学基金;
关键词
complex multi-products; setup times; integrated scheduling; algorithm; manufacturing tree;
D O I
10.1109/ICACC.2010.5486771
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The problem of considering the setup times in scheduling with non-sequence constraint between operations has been researched, but there are no researches on the problem of considering the setup times in processing and assembly integrated scheduling of complex multi-product dynamic scheduling with sequence constraint between operations. So, a complex multi-product dynamic scheduling algorithm is proposed, considering sequence-dependent setup times. The algorithm constructs the virtual manufacturing tree in the way of root alignment and converts the complex multi-product dynamic scheduling problem to the complex single product scheduling problem. After the scheduling sequence of operations is determined, the starting time of each operation is determined by dynamically inserting setup time once. As the (1) proposed algorithm avoids several movements of the scheduled operation when the setup time is inserted, the time complexity is sharply reduced. Theoretical analysis and examples show that the proposed algorithm not only can solve the complex multi-product dynamic scheduling problem with sequence-dependent setup times, but also is simple and practical.
引用
收藏
页码:19 / 24
页数:6
相关论文
共 50 条
  • [1] Dynamic Integrated Scheduling Algorithm of Complex Multi-Products with Identical Machines
    Xie Zhiqiang
    Yang Jing
    He Yujing
    Ye Guangjie
    MATERIALS AND MANUFACTURING TECHNOLOGY, PTS 1 AND 2, 2010, 129-131 : 897 - +
  • [2] Flow shop batching and scheduling with sequence-dependent setup times
    Liji Shen
    Jatinder N. D. Gupta
    Udo Buscher
    Journal of Scheduling, 2014, 17 : 353 - 370
  • [3] Flow shop batching and scheduling with sequence-dependent setup times
    Shen, Liji
    Gupta, Jatinder N. D.
    Buscher, Udo
    JOURNAL OF SCHEDULING, 2014, 17 (04) : 353 - 370
  • [4] Machine Scheduling with Sequence-dependent Setup Times using a Randomized Search Heuristic
    Montoya-Torres, Jairo R.
    Soto-Ferrari, Milton
    Gonzalez-Solano, Fernando
    Alfonso-Lizarazo, Edgar H.
    CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 28 - +
  • [5] Dynamic parallel machine scheduling with sequence-dependent setup times using an iterated greedy heuristic
    Ying, Kuo-Ching
    Cheng, Hui-Miao
    EXPERT SYSTEMS WITH APPLICATIONS, 2010, 37 (04) : 2848 - 2852
  • [6] An Improved Firefly Algorithm for the Unrelated Parallel Machines Scheduling Problem With Sequence-Dependent Setup Times
    Ezugwu, Absalom E.
    Akutsah, Francis
    IEEE ACCESS, 2018, 6 : 54459 - 54478
  • [7] A branch-and-cut algorithm for a production scheduling problem with sequence-dependent and time-dependent setup times
    Stecco, Gabriella
    Cordeau, Jean-Franqois
    Moretti, Elena
    COMPUTERS & OPERATIONS RESEARCH, 2008, 35 (08) : 2635 - 2655
  • [8] Dynamic order acceptance and scheduling problem with sequence-dependent setup time
    Xu, Lei
    Wang, Qian
    Huang, Simin
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (19) : 5797 - 5808
  • [9] Metaheuristic solutions to the "Job shop scheduling problem with sequence-dependent setup times"
    Gonzalez, Miguel A.
    AI COMMUNICATIONS, 2013, 26 (04) : 419 - 421
  • [10] Single machine scheduling with sequence-dependent setup times and delayed precedence constraints
    Kuo, Yiyo
    Chen, Sheng-, I
    Yeh, Yen-Hung
    OPERATIONAL RESEARCH, 2020, 20 (02) : 927 - 942