Risk Assessment of Water Resources and Energy Security Based on the Cloud Model: A Case Study of China in 2020

被引:10
|
作者
Yang, Yafeng [1 ,2 ]
Wang, Hongrui [1 ]
Zhang, Yuanyuan [1 ]
Wang, Cheng [3 ,4 ]
机构
[1] Beijing Normal Univ, Coll Water Sci, Beijing Key Lab Urban Hydrol Cycle & Sponge City, Beijing 100875, Peoples R China
[2] North China Univ Sci & Technol, Coll Sci, Tangshan 063210, Peoples R China
[3] Argonne Natl Lab, Environm Sci Div, Lemont, IL 60439 USA
[4] Univ Chicago, Consortium Adv Sci & Engn, Chicago, IL 60637 USA
基金
中国国家自然科学基金;
关键词
water resources-energy security; cloud model; Liang-Kleeman information flow; risk assessment; GM (1; 1); Pearson III curve; RIVER-BASIN; DIVERSITY; NEXUS;
D O I
10.3390/w13131823
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
With the rapid development of economy and society, China's demand for water resources and energy is increasing, and the supply situation is becoming increasingly severe. The correlation and binding characteristics between the two have become increasingly prominent, which will become bottlenecks in sustainable economic and social development in the future. In this paper, the Liang-Kleeman method was used to screen the risk factors of water resources and energy security, and then four major risk factors were selected. Based on the cloud model, the water resource and energy security risk assessment models were constructed combined with the predicted values using GM (1,1) and Pearson III curve methods, and the water resource and energy security risks of 30 provinces (cities) in 2020 were quantitatively assessed. The risk assessment results showed that the risk level zoning of water resource shortage with different guarantee rates in most regions has undergone little change, but the spatial distribution was quite different, showing the characteristics of "low in the South and high in the North". When the guarantee rate changed from P = 25% to P = 95%, the risk level of water shortage in Sichuan, Jiangxi, Hunan, Hainan, Jilin, Ningxia and Nei Monggol significantly increased, and the spatial distribution of energy security risk and water resource shortage risk was obviously inconsistent.
引用
收藏
页数:14
相关论文
共 50 条
  • [21] Risk assessment of floor water inrush based on TOPSIS combined weighting model: a case study in a coal mine, China
    Li, Qiang
    Lu, Cunjin
    Zhao, Hui
    EARTH SCIENCE INFORMATICS, 2023, 16 (01) : 565 - 578
  • [22] Risk assessment of floor water inrush based on TOPSIS combined weighting model: a case study in a coal mine, China
    Qiang Li
    Cunjin Lu
    Hui Zhao
    Earth Science Informatics, 2023, 16 : 565 - 578
  • [23] Risk assessment of wind-photovoltaic-hydrogen storage projects using an improved fuzzy synthetic evaluation approach based on cloud model: A case study in China
    Wu, Yunna
    Chu, Han
    Xu, Chuanbo
    JOURNAL OF ENERGY STORAGE, 2021, 38
  • [24] Assessment of the development level of regional industrialized building based on cloud model: A case study in Guangzhou, China
    Wang, Tao
    Wang, Xuetong
    Wang, Liang
    Au-Yong, Cheong Peng
    Ali, Azlan Shah
    JOURNAL OF BUILDING ENGINEERING, 2021, 44
  • [25] A novel composite cloud model-based three-stage evaluation for the spatial equilibrium of water resources in China
    Chen, Hui
    Yang, Xiaohua
    Bian, Dehui
    Xiang, Weiqi
    JOURNAL OF CLEANER PRODUCTION, 2024, 456
  • [26] A failure mode and risk assessment method based on cloud model
    Li, Xinlong
    Ran, Yan
    Zhang, Genbao
    He, Yan
    JOURNAL OF INTELLIGENT MANUFACTURING, 2020, 31 (06) : 1339 - 1352
  • [27] A Case Study of Flood Risk Evaluation Based on Emergy Theory and Cloud Model in Anyang Region, China
    Wu, Zening
    Cui, Yuhai
    Guo, Yuan
    WATER, 2021, 13 (04)
  • [28] Risk assessment model of water resources and hydropower project
    Liu, Junyan
    Chen, Huifeng
    PROCEEDINGS OF THE 2008 INTERNATIONAL CONFERENCE ON E-RISK MANAGEMENT (ICERM 2008), 2008, : 325 - +
  • [29] A failure mode and risk assessment method based on cloud model
    Xinlong Li
    Yan Ran
    Genbao Zhang
    Yan He
    Journal of Intelligent Manufacturing, 2020, 31 : 1339 - 1352
  • [30] Risk assessment and water safety plan: case study in Beijing, China
    Ye, Bixiong
    Chen, Yuansheng
    Li, Yonghua
    Li, Hairong
    Yang, Linsheng
    Wang, Wuyi
    JOURNAL OF WATER AND HEALTH, 2015, 13 (02) : 510 - 521