Study on complex products collaborative design for assembly under distributed environment

被引:0
作者
Wu, Shijing [1 ]
Deng, Mingxing [1 ]
Xie, Jing [1 ]
Luo, Lilun [1 ]
机构
[1] Wuhan Univ, Sch Power & Mech Engn, Wuhan 430072, Hubei, Peoples R China
来源
DCABES 2007 PROCEEDINGS, VOLS I AND II | 2007年
关键词
distributed environment; design for assembly (DFA); complex product; top-down; preassembly;
D O I
暂无
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
Considering all the factors that affect the assembly performance of a product, design concept and contents of collaborative design for assembly are discussed; model of complex products collaborative design system for assembly under distributed environment is presented, and its function structure model and running mechanism are described from system realization viewpoint. With resources of the whole net, structure detailed design, static structure feasibility analysis and process assembly feasibility analysis are carried out by means of combination of human-computer and human-human collaboration. Finally, system of complex products collaborative design for assembly under distributed environment is realized based on this model.
引用
收藏
页码:97 / 100
页数:4
相关论文
共 24 条
[1]  
CAO CS, RES INFORM MODEL VIR
[2]   AUTOMATIC ASSEMBLY SEQUENCES GENERATION BY PATTERN-MATCHING [J].
CHEN, CLP .
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS, 1991, 21 (02) :376-389
[3]   On the automatic generation of product assembly sequences [J].
Choi, CK ;
Zha, XF ;
Ng, TL ;
Lau, WS .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1998, 36 (03) :617-633
[4]   SIMPLIFIED GENERATION OF ALL MECHANICAL ASSEMBLY SEQUENCES [J].
DEFAZIO, TL ;
WHITNEY, DE .
IEEE JOURNAL OF ROBOTICS AND AUTOMATION, 1987, 3 (06) :640-658
[5]  
DENG WP, 2003, J SYSTEM SIMULATION, V15, P158
[6]   Generation of optimized assembly sequences using genetic algorithms [J].
Dini, G ;
Failli, F ;
Lazzerini, B ;
Marcelloni, F .
CIRP ANNALS 1999 - MANUFACTURING TECHNOLOGY, 1999, :17-20
[7]  
FAILLI F, P 2 CIRP INT SEM INT, P227
[8]  
GOTTSCHALK S, P SIGGRAPH 96 C, P171
[9]  
HELD M, 1995, P 7 CAN C COMP GEOM, P205
[10]   A NEURAL-NETWORK-BASED COMPUTATIONAL SCHEME FOR GENERATING OPTIMIZED ROBOTIC ASSEMBLY SEQUENCES [J].
HONG, DS ;
CHO, HS .
ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 1995, 8 (02) :129-145