Optimum post-disruption restoration under uncertainty for enhancing critical infrastructure resilience

被引:96
作者
Fang, Yi-Ping [1 ]
Sansavini, Giovanni [2 ]
机构
[1] Univ Paris Saclay, Chairs Syst Sci & Energy Challenge, Fdn Elect France EDF, Lab Genie Ind,Cent Supelec, 3 Rue Joliot Curie, F-91190 Gif Sur Yvette, France
[2] Swiss Fed Inst Technol, Lab Reliabil & Risk Engn, Inst Energy Technol, Dept Mech & Proc Engn, Leonhardstr 21, CH-8092 Zurich, Switzerland
关键词
Critical infrastructures; System resilience; Restoration planning; Uncertainty; Stochastic programming; INTEGRATED NETWORK DESIGN; GENETIC ALGORITHMS; SCENARIO REDUCTION; REPAIR POLICIES; SYSTEMS; MAINTENANCE; RISK; OPTIMIZATION; COMPLEXITY;
D O I
10.1016/j.ress.2018.12.002
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The planning of post-disruption restoration in critical infrastructure systems often relies on deterministic assumptions such as complete information on resources and known duration of the repair tasks. In fact, the uncertainties faced by restoration activities, e.g. stemming from subjective estimates of resources and costs, are rarely considered. Thus, the solutions obtained by a deterministic approach may be suboptimal or even infeasible under specific realizations of the uncertainties. To bridge this gap, this paper investigates the effects of uncertain repair time and resources on the post-disruption restoration of critical infrastructure. Two-stage stochastic optimization provides insights for prioritizing the intensity and time allocation of the repair activities with the objective of maximizing system resilience. The inherent stochasticity is represented via a set of scenarios capturing specific realizations of repair activity durations and available resources, and their probabilities. A multi-mode restoration model is proposed that offers more flexibility than its single-mode counterpart. The restoration framework is applied to the reduced British electric power system and the results demonstrate the added value of using the stochastic model as opposed to the deterministic model. Particularly, the benefits of the proposed stochastic method increase as the uncertainty associated with the restoration process grows. Finally, decision-making under uncertainty largely impacts the optimum repair modes and schedule.
引用
收藏
页码:1 / 11
页数:11
相关论文
共 65 条
[1]   Evaluating project completion times when activity times are Weibull distributed [J].
Abdelkader, YH .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 157 (03) :704-715
[2]  
Ahmed S., 2010, Wiley Encyclopedia of Operations Research and Management Science
[3]  
Ahmed S, WILEY ENCY OPERATION
[4]  
Ahuja R. K., 1993, NETWORK FLOWS THEORY
[5]   OPTIMAL MAINTENANCE REPAIR POLICIES FOR THE MACHINE REPAIR PROBLEM [J].
ALBRIGHT, SC .
NAVAL RESEARCH LOGISTICS, 1980, 27 (01) :17-27
[6]  
[Anonymous], ESREL 2013
[7]  
[Anonymous], 2014, CRITICAL INFRASTRUCT
[8]  
[Anonymous], 2009, Lectures on Stochastic Programming: Modeling and Theory
[9]  
Bailey TG, 1999, NAV RES LOG, V46, P753, DOI 10.1002/(SICI)1520-6750(199910)46:7<753::AID-NAV1>3.0.CO
[10]  
2-M