A variable trip time model for cyclic railway timetabling

被引:88
作者
Kroon, LG
Peeters, LWP
机构
[1] NS Reizigers, Dept Logist, NL-3500 HA Utrecht, Netherlands
[2] Erasmus Univ, Rotterdam Sch Management, NL-3000 DR Rotterdam, Netherlands
关键词
D O I
10.1287/trsc.37.2.198.15247
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper we describe how variable trip times can be included into an existing cyclic railway timetabling model based on the well-known periodic event scheduling problem (PESP). Thereby we provide an extension of the existing model because in the existing model it is assumed that the trip times of all trains on all tracks of the railway network are known a priori. However, the latter may be too restrictive in practice. The solution space of the extended model that we present is larger because small deviations from the fixed trip times are allowed. This is especially useful when a feasible solution to the fixed trip time model does not exist. The solutions obtained from the extended model are proven to be correct under certain necessary and sufficient conditions. Furthermore, the extended model has the same general structure as the original model. Therefore, solution methods developed for the original fixed trip time model can be applied to the extended model as well.
引用
收藏
页码:198 / 212
页数:15
相关论文
共 13 条
[1]  
GOVERDE RMP, 1999, P TRAIL 5 ANN C DELF, V2
[2]   Decision support systems support the search for win-win solutions in railway network design [J].
Hooghiemstra, JS ;
Kroon, LG ;
Odijk, MA ;
Salomon, M ;
Zwaneveld, PJ .
INTERFACES, 1999, 29 (02) :15-32
[3]  
Lindner T., 2000, Ph.D. thesis
[4]   Minimizing waiting times in integrated fixed interval timetables by upgrading railway tracks [J].
Nachtigall, K ;
Voget, S .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 103 (03) :610-627
[5]   A genetic algorithm approach to periodic railway synchronization [J].
Nachtigall, K ;
Voget, S .
COMPUTERS & OPERATIONS RESEARCH, 1996, 23 (05) :453-463
[6]  
Nachtigall K., 1999, THESIS DTSCH ZENTRUM
[7]   A constraint generation algorithm for the construction of periodic railway timetables [J].
Odijk, MA .
TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 1996, 30 (06) :455-464
[8]  
Odijk MA, 1997, THESIS DELFT U TECHN
[9]  
PEETERS LWP, 2001, COMPUTER AIDED SCHED, P275
[10]  
SCHRIJVER A, 1994, DIENSTREGELINGONTWIK