Managing owner's risk of contractor default

被引:21
作者
Al-Sobiei, OS
Arditi, D
Polat, G
机构
[1] MODA, GDMW, Head Tech Support Sect, Riyadh 11542, Saudi Arabia
[2] IIT, Dept Civil & Architectural Engn, Chicago, IL 60616 USA
来源
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE | 2005年 / 131卷 / 09期
关键词
D O I
10.1061/(ASCE)0733-9364(2005)131:9(973)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The objective of the study presented in this paper is to provide owners with a decision-making mechanism that will free them from automatically taking the, typical "transfer the risk to a surety" option and will allow them to make intelligent and economical decisions that include retaining or avoiding the risk of contractor default. The methodology involves using artificial neural network (ANN) and a genetic algorithm (GA) training strategies the risk of contractor default. Prediction rates of 75 and 88% were obtained gies to predict with the ANN and GA training strategies, respectively. The model is of relevance to owners because once the likelihood of contractor default is predicted and the owner's risk behavior is established, the owner can make a decision to retain, transfer, or avoid the risk of contractor default. It. is of relevance to surety companies too as it may speed up the process of bonding and of reaching more reliable and objective bond/not bond decisions. The comparative use of the ANN and GA training strategies is of particular relevance to researchers.
引用
收藏
页码:973 / 978
页数:6
相关论文
共 21 条
  • [1] ARDITI D, 2000, ENG CONSTR ARCHIT MA, V7, P120, DOI DOI 10.1108/EB021137
  • [2] ARGENTI J, 1976, CORPORATE COLLAPSE
  • [3] Boussabaine A.H., 1996, Constr. Manag. Econ., V14, P427, DOI DOI 10.1080/014461996373296
  • [4] SURVIVAL CHANCES OF NEWLY FOUNDED BUSINESS ORGANIZATIONS
    BRUDERL, J
    PREISENDORFER, P
    ZIEGLER, R
    [J]. AMERICAN SOCIOLOGICAL REVIEW, 1992, 57 (02) : 227 - 242
  • [5] BURGER R, 2003, COST ENG, V45, P12
  • [6] THE RELATIONSHIP BETWEEN BOARD COMPOSITION AND LEADERSHIP STRUCTURE AND BANKRUPTCY REORGANIZATION OUTCOMES
    DAILY, CM
    [J]. JOURNAL OF MANAGEMENT, 1995, 21 (06) : 1041 - 1056
  • [7] FREDRICKSON JW, 1984, ACAD MANAGE J, V27, P399, DOI 10.5465/255932
  • [8] FREDRICKSON JW, 1989, ACAD MANAGE J, V32, P516, DOI 10.5465/256433
  • [9] FREDRICKSON JW, 1984, ACAD MANAGE J, V27, P454
  • [10] Hua G.B., 1996, Construction management and economics, V14, P25, DOI DOI 10.1080/01446199600000004