Resource-constrained assembly line balancing problems with multi-manned workstations

被引:39
|
作者
Chen, Yin-Yann [1 ]
Cheng, Chen-Yang [2 ]
Li, Jia-Ying [1 ]
机构
[1] Natl Formosa Univ, Dept Ind Management, Huwei Township 63201, Yunlin, Taiwan
[2] Natl Taipei Univ Technol, Dept Ind Engn & Management, Taipei 10608, Taiwan
关键词
Line balancing; Multi-manned workstation; Genetic algorithm; Resource constraint; ANT COLONY OPTIMIZATION; DEPENDENT SETUP TIMES; GENETIC ALGORITHM; MATHEMATICAL-MODEL; WORKER; FORMULATION; STATION; TYPE-2; TASKS;
D O I
10.1016/j.jmsy.2018.07.001
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This study proposes a mixed integer programming model for the resource constrained assembly line balancing problem with multi-manned workstations. Resources refer to machines or tools (such as jigs and hand tools) in the production line. The objective is to minimize the number of workstations, operators, and resources to obtain the optimal allocation of tasks, operators, machines, and resources. To improve the solving efficiency, this study develops a hybrid heuristic approach that combines the procedure of building feasible balancing solutions and the genetic algorithm. In the practical case of an automobile factory, the traditional planning method was compared with the proposed approach. Results in terms of solution quality, production efficiency, and allocation configuration are analyzed and discussed. The findings of this study can be used as reference for decision making in the allocation of tasks, workstations, and operators in the manufacturing industry.
引用
收藏
页码:107 / 119
页数:13
相关论文
共 50 条
  • [1] An efficient branch and bound algorithm for assembly line balancing problems with parallel multi-manned workstations
    Kellegoz, Talip
    Toklu, Bilal
    COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (12) : 3344 - 3360
  • [2] Line balancing problem with multi-manned workstations and resource constraints: The case of electronics waste disassembly
    Chen, Yin-Yann
    Pourhejazy, Pourya
    Liu, Tzu-Ning
    CLEANER LOGISTICS AND SUPPLY CHAIN, 2024, 10
  • [3] Type-E disassembly line balancing problem with multi-manned workstations
    Ibrahim Kucukkoc
    Zixiang Li
    Yuchen Li
    Optimization and Engineering, 2020, 21 : 611 - 630
  • [4] Type-E disassembly line balancing problem with multi-manned workstations
    Kucukkoc, Ibrahim
    Li, Zixiang
    Li, Yuchen
    OPTIMIZATION AND ENGINEERING, 2020, 21 (02) : 611 - 630
  • [5] The multi-manned joint assembly line balancing and feeding problem
    Zangaro, Francesco
    Minner, Stefan
    Battini, Daria
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2023, 61 (16) : 5543 - 5565
  • [6] A simulated annealing algorithm for multi-manned assembly line balancing problem
    Roshani, Abdolreza
    Roshani, Arezoo
    Roshani, Abdolhassan
    Salehi, Mohsen
    Esfandyari, Azadeh
    JOURNAL OF MANUFACTURING SYSTEMS, 2013, 32 (01) : 238 - 247
  • [7] Multi-manned assembly line balancing problem with balanced load density
    Yilmaz, Hamid
    Yilmaz, Mustafa
    ASSEMBLY AUTOMATION, 2015, 35 (01) : 137 - 142
  • [8] Constraint programming model for multi-manned assembly line balancing problem
    Cil, Zeynel Abidin
    Kizilay, Damla
    COMPUTERS & OPERATIONS RESEARCH, 2020, 124
  • [9] Assembly line balancing: general resource-constrained case
    Corominas, Albert
    Ferrer, Laia
    Pastor, Rafael
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (12) : 3527 - 3542
  • [10] A mathematical model and tabu search algorithm for multi-manned assembly line balancing problems with assignment restrictions
    Yilmaz, Hamid
    Yilmaz, Mustafa
    ENGINEERING OPTIMIZATION, 2020, 52 (05) : 856 - 874