Effect of kanban size on just-in-time manufacturing systems

被引:29
作者
Chan, FTS [1 ]
机构
[1] Univ Hong Kong, Dept Ind & Mfg Syst Engn, Hong Kong, Hong Kong, Peoples R China
关键词
JIT; kanban; simulation; fill rate; pull system;
D O I
10.1016/S0924-0136(01)01022-6
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Setting kanban sizes is one of the first decisions that users of kanban system must address. yet researchers have largely assumed kanban sizes to be given. This paper investigates the effect of varying kanban size on the performance of just-in-time (JIT) manufacturing systems. Two types of JIT production systems, the Pull-type and the Hybrid-type are analysed using computer simulation models. The performance measures considered simultaneously are the fill rate, in-process inventory, and manufacturing lead time. Parameters such as demand rate, processing time, and kanban size are taken into consideration, thereby finding the possible solutions of the kanban size that can be employed to achieve the most favourable conditions for production. A favourable condition usually refers to the ability of the system to produce finished goods at a shortest possible lead time, which the customers are always demanding for. Both the single product and multi-products manufacturing environments are investigated. With reference to the analysis, for a single product, as the kanban size increased, the fill rate decreased. whilst with both the in-process inventory and the manufacturing lead time increased. Generally, for multi-products manufacture, it was observed that as the kanban size increased, the fill rate increased with a decrease in the manufacturing lead time. However, for multi-products the interaction between the manufacturing lead time and the fill rate is discussed in depth in this paper. (C) 2001 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:146 / 160
页数:15
相关论文
共 15 条
[1]   Integrated lot-sizing and scheduling for just-in-time production of complex assemblies with finite set-ups [J].
Anwar, MF ;
Nagi, R .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (05) :1447-1470
[2]   A simulation study of container size in two-card kanban systems [J].
Berkley, BJ .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (12) :3417-3445
[3]   TANDEM QUEUES AND KANBAN-CONTROLLED LINES [J].
BERKLEY, BJ .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1991, 29 (10) :2057-2081
[4]  
Chan FTS, 1996, INT J MATER PROD TEC, V11, P108
[5]  
CHAN FTS, 1996, P INT S ADV MAN PROC, P27
[6]   Overplanning factor in Toyota's formula for computing the number of kanban [J].
Co, HC ;
Sharafali, M .
IIE TRANSACTIONS, 1997, 29 (05) :409-415
[7]   Overview of Kanban systems [J].
Huang, CC ;
Kusiak, A .
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 1996, 9 (03) :169-189
[8]   BATCHING POLICY IN KANBAN SYSTEMS [J].
KARMARKAR, US ;
KEKRE, S .
JOURNAL OF MANUFACTURING SYSTEMS, 1989, 8 (04) :317-328
[9]   A COMPARISON OF ALTERNATIVE KANBAN CONTROL MECHANISMS .2. EXPERIMENTAL RESULTS [J].
MUCKSTADT, JA ;
TAYUR, SR .
IIE TRANSACTIONS, 1995, 27 (02) :151-161
[10]   A COMPARISON OF ALTERNATIVE KANBAN CONTROL MECHANISMS .1. BACKGROUND AND STRUCTURAL RESULTS [J].
MUCKSTADT, JA ;
TAYUR, SR .
IIE TRANSACTIONS, 1995, 27 (02) :140-150