A two-stage AIS approach for grid scheduling problems

被引:9
|
作者
Liu, Chen-Hao [2 ]
Huang, Wei-Hsiu [1 ]
Chang, Pei-Chann [1 ]
机构
[1] Yuan Ze Univ, Dept Informat Management, Tao Yuan 32003, Taiwan
[2] Kai Nan Univ, Dept Informat Management, Tao Yuan 33857, Taiwan
关键词
AIS; early convergence; Makespan; grid scheduling; meta-heuristics; ARTIFICIAL IMMUNE-SYSTEM; HYBRID FLOW-SHOP; GENETIC ALGORITHM;
D O I
10.1080/00207543.2011.578166
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Grid workflow scheduling problem has been a research focus in grid computing in recent years. Various deterministic or meta-heuristic scheduling approaches have been proposed to solve this NP-complete problem. A perusal of published papers on the artificial immune system (AIS) reveals that most researchers use the clonal selection of B cells during the evolving processes and the affinity function of B cells to solve various optimisation problems. This research takes a different approach to the subject - firstly by applying a modified algorithm (Hu, T.C., 1961. Parallel sequencing and assembly line problem. Operations Research, 9 (6), 841-848) to sequence the job and this sequence is applied for further application. Secondly, the derived sequence is then used for machine allocations using the AIS approach. The proposed AIS apply B cells to reduce the antigens and then combining T helper cells and T suppressor cells to solve the grid scheduling problems. Our proposed methodology differs from other earlier approaches as follows: 1. A two-stage approach is applied using a fixed sequence derived from heuristic to allocate machine. 2. AIS apply B cells as bases and then T cells are employed next. T helper cells are used to help improve the solution and then T suppressor cells are generated to increase the diversity of the population. A new formula is proposed to calculate the affinity of the antibody with the antigen. The total difference of completion time of each job is applied instead of the difference of makespan of the schedule. This new AIS method can supplement the flaw of genetic algorithms (GA) using fitness as the basis and a new lifespan which will keep good diversified chromosomes within the population to extend the searching spaces. The experimental tests show that this novel AIS method is very effective when compared with other meta-heuristics such as GA, simulated annealing (SA), and ant colony optimisation (ACO).
引用
收藏
页码:2665 / 2680
页数:16
相关论文
共 50 条
  • [31] Two-Stage Optimal Scheduling Strategy for Micro-Grid Considering EV Default Uncertainty
    Li C.
    Xu M.
    Cai S.
    Diangong Jishu Xuebao/Transactions of China Electrotechnical Society, 2023, 38 (07): : 1838 - 1851
  • [32] Scheduling two-stage jobs on multiple flowshops
    Wu, Guangwei
    Chen, Jianer
    Wang, Jianxin
    THEORETICAL COMPUTER SCIENCE, 2019, 776 : 117 - 124
  • [33] Scheduling multiple two-stage flowshops with a deadline
    Chen, Jianer
    Huang, Minjie
    Guo, Yin
    THEORETICAL COMPUTER SCIENCE, 2022, 921 : 100 - 111
  • [34] Bicriteria in a two-stage flowshop scheduling problem
    Bagga, PC
    Bhambani, A
    INDIAN JOURNAL OF PURE & APPLIED MATHEMATICS, 2000, 31 (11): : 1475 - 1481
  • [35] Two-stage production scheduling with an outsourcing option
    Lee, Kangbok
    Choi, Byung-Cheon
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 213 (03) : 489 - 497
  • [36] A two-stage heuristic algorithm for locomotive scheduling
    Zhang, Jie
    Ni, Shaoquan
    Ge, Lulu
    Wang, Yuanyuan
    Information Technology Journal, 2013, 12 (11) : 2153 - 2159
  • [37] A distributionally robust optimization approach for two-stage facility location problems
    Gourtani, Arash
    Nguyen Tri-Dung
    Xu, Huifu
    EURO JOURNAL ON COMPUTATIONAL OPTIMIZATION, 2020, 8 (02) : 141 - 172
  • [38] A two-stage genetic algorithm for multi-objective job shop scheduling problems
    Kachitvichyanukul, Voratas
    Sitthitham, Siriwan
    JOURNAL OF INTELLIGENT MANUFACTURING, 2011, 22 (03) : 355 - 365
  • [39] A two-stage algorithm for project scheduling problems with multi-skilled workforce constraints
    Wang, Yi-Fan
    Liu, Shi-Xin
    Chen, Di
    Dongbei Daxue Xuebao/Journal of Northeastern University, 2014, 35 (02): : 184 - 189
  • [40] Two-stage Robust Optimal Scheduling for Microgrids
    Duan, Jiandong
    Cheng, Ran
    Wang, Jing
    2021 8TH INTERNATIONAL FORUM ON ELECTRICAL ENGINEERING AND AUTOMATION, IFEEA, 2021, : 505 - 510