Impact of continuous climb operations on airport capacity

被引:11
作者
Perez-Castan, J. A. [1 ]
Gomez Comendador, F. [1 ]
Rodriguez-Sanz, A. [1 ]
Barragan Montes, R. [1 ]
Arnaldo Valdes, R. [1 ]
Perez Sanz, L. [1 ]
机构
[1] Univ Politecn Madrid, Pza Cardenal Cisneros S-N, E-28040 Madrid, Spain
关键词
Air transport; Continuous climb operations; Airport capacity; Conflict-detection algorithm; AUTOMATED CONFLICT-RESOLUTION; ARRIVAL; FLIGHT; OPTIMIZATION; MANAGEMENT; AIRCRAFT; MODEL; TIME; FUEL;
D O I
10.1016/j.trc.2018.09.008
中图分类号
U [交通运输];
学科分类号
08 ; 0823 ;
摘要
The full benefits of Continuous Climb Operations (CCO) are realised when CCO are performed without interruption. However, CCO require safe departures that necessarily implies a reduction in capacity at high density traffic airports. This paper quantifies the capacity impact due to the integration of CCO (conflict-free with other departures and arrivals) in a high density traffic airport. The methodology develops a scheduling algorithm, a conflict-detection and resolution algorithm, and Monte Carlo simulations. The scheduling algorithm calculates two schedules, one for departures and another for arrivals, considering the CCO Rate. The conflict-detection and resolution algorithm compares CCO and arrival trajectories to detect which aircraft pairs are in conflict. The Air Traffic Control (ATC) intervention required to solve the conflict is modelled by delaying the CCO take-off. Numerical simulations based on Monte Carlo techniques are used to analyse scheduling combinations that are statistically significant in terms of conflict, ATC interventions, total delay and capacity. The results show a 32% reduction in the maximum theoretical capacity with a CCO Rate of 100%. Despite the reduction, the number of CCO departures is above the maximum operational capacity (50% of the maximum theoretical capacity). This implies that with optimised scheduling it is possible for all departures to be CCO.
引用
收藏
页码:231 / 250
页数:20
相关论文
共 56 条
[31]  
Kim B., 2013, 86 ACRP, DOI [10.17226/22565, DOI 10.17226/22565]
[32]   Solving the Air Conflict Resolution Problem Under Uncertainty Using an Iterative Biobjective Mixed Integer Programming Approach [J].
Lehouillier, Thibault ;
Nasri, Moncef Ilies ;
Soumis, Francois ;
Desaulniers, Guy ;
Omer, Jeremy .
TRANSPORTATION SCIENCE, 2017, 51 (04) :1242-1258
[33]   Integrated sequencing and merging aircraft to parallel runways with automated conflict resolution and advanced avionics capabilities [J].
Liang, Man ;
Delahaye, Daniel ;
Marechal, Pierre .
TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES, 2017, 85 :268-291
[34]   Evaluation of potential near-term operational changes to mitigate environmental impacts of aviation [J].
Marais, Karen B. ;
Reynolds, Tom G. ;
Uday, Payuna ;
Muller, Delri ;
Lovegren, Jonathan ;
Dumont, Jean-Marie ;
Hansman, R. John .
PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART G-JOURNAL OF AEROSPACE ENGINEERING, 2013, 227 (08) :1277-1299
[35]   Integrated Disruption Management and Flight Planning to Trade Off Delays and Fuel Burn [J].
Marla, Lavanya ;
Vaaben, Bo ;
Barnhart, Cynthia .
TRANSPORTATION SCIENCE, 2017, 51 (01) :88-111
[36]  
McConnachie D., 2015, 11 US EUROPE, P1, DOI DOI 10.1109/DASC.2011.6096003
[37]  
McEnteggart Q., 2015, J AIRCRAFT, V55, DOI [10.2514/1.0033132, DOI 10.2514/1.0033132]
[38]   An environmental assessment of air traffic speed constraints in the departure phase of flight: A case study at Gothenburg Landvetter Airport, Sweden [J].
Mitchell, Deborah ;
Ekstrand, Henrik ;
Prats, Xavier ;
Gronstedt, Tomas .
TRANSPORTATION RESEARCH PART D-TRANSPORT AND ENVIRONMENT, 2012, 17 (08) :610-618
[39]  
Murdoch J.L., 2009, P 8 US EUR AIR TRAFF, P325
[40]  
Paielli R. A., 2017, AIAA AV TECHN INT OP, P312, DOI [10.2514/6.2017-4256, DOI 10.2514/6.2017-4256]