Sequence-dependent batch chemical scheduling with earliness and tardiness penalties

被引:6
作者
McGraw, KE [1 ]
Dessouky, MM [1 ]
机构
[1] Univ So Calif, Dept Ind & Syst Engn, Los Angeles, CA 90089 USA
关键词
D O I
10.1080/00207540110056180
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Production volume in the specialized agricultural chemical industry is typically too small to justify the capital expenditure required for continuous processing. As such, there is a trend towards building chemical processing plants for this market segment that are batch plants. Scheduling of this type of chemical plant under just-in-time operations, where both earliness and lateness penalties are included, is critical to the efficient operation of these plants. In this paper, a heuristic scheduling procedure is developed for the problem of minimizing the total weighted earliness and tardiness costs as well as the total set-up cost for the single-stage batch chemical manufacturing environment.
引用
收藏
页码:3085 / 3107
页数:23
相关论文
共 50 条
[41]   Minimizing the sum of maximum earliness and maximum tardiness in the single-machine scheduling problem with sequence-dependent setup time [J].
Nekoiemehr, N. ;
Moslehi, G. .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2011, 62 (07) :1403-1412
[42]   Scheduling jobs with different, job-dependent earliness and tardiness penalties using the SLK method [J].
Adamopoulos, GI ;
Pappis, CP .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 88 (02) :336-344
[43]   Scheduling about a common due date with job-dependent asymmetric earliness and tardiness penalties [J].
Cai, X ;
Lum, VYS ;
Chan, JMT .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 98 (01) :154-168
[44]   Earliness/tardiness minimization in a no-wait flow shop with sequence-dependent setup times [J].
Felipe Guevara-Gueyara, Andres ;
Gomez-Fuentes, Valentina ;
Johana Posos-Rodriguez, Leidy ;
Remolina-Gomez, Nicolas ;
Maria Gonzalez-Neira, Eliana .
JOURNAL OF PROJECT MANAGEMENT, 2021, :177-190
[46]   Parallel machine scheduling with earliness-tardiness penalties and space limits [J].
Suk Jae Jeong ;
Kyung Sup Kim .
The International Journal of Advanced Manufacturing Technology, 2008, 37 :793-802
[47]   BICRITERIA SCHEDULING PROBLEM INVOLVING TOTAL TARDINESS AND TOTAL EARLINESS PENALTIES [J].
AZIZOGLU, M ;
KONDAKCI, S ;
KIRCA, O .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1991, 23 (1-3) :17-24
[48]   Scheduling with generalized batch delivery dates and earliness penalties [J].
Yang, XG .
IIE TRANSACTIONS, 2000, 32 (08) :735-741
[49]   Single machine scheduling with earliness-tardiness and completion time penalties [J].
Zhao, Yufang .
2007 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS, VOLS 1-6, 2007, :268-271