Sequence-dependent batch chemical scheduling with earliness and tardiness penalties

被引:6
作者
McGraw, KE [1 ]
Dessouky, MM [1 ]
机构
[1] Univ So Calif, Dept Ind & Syst Engn, Los Angeles, CA 90089 USA
关键词
D O I
10.1080/00207540110056180
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Production volume in the specialized agricultural chemical industry is typically too small to justify the capital expenditure required for continuous processing. As such, there is a trend towards building chemical processing plants for this market segment that are batch plants. Scheduling of this type of chemical plant under just-in-time operations, where both earliness and lateness penalties are included, is critical to the efficient operation of these plants. In this paper, a heuristic scheduling procedure is developed for the problem of minimizing the total weighted earliness and tardiness costs as well as the total set-up cost for the single-stage batch chemical manufacturing environment.
引用
收藏
页码:3085 / 3107
页数:23
相关论文
共 50 条
[31]   Machine scheduling with earliness, tardiness and non-execution penalties [J].
Hassin, R ;
Shani, M .
COMPUTERS & OPERATIONS RESEARCH, 2005, 32 (03) :683-705
[32]   PARALLEL-MACHINE SCHEDULING PROBLEMS WITH EARLINESS AND TARDINESS PENALTIES [J].
CHENG, TCE ;
CHEN, ZL .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1994, 45 (06) :685-695
[33]   SCHEDULING ABOUT A COMMON DUE DATE WITH EARLINESS AND TARDINESS PENALTIES [J].
DE, P ;
GHOSH, JB ;
WELLS, CE .
COMPUTERS & OPERATIONS RESEARCH, 1990, 17 (02) :231-241
[34]   Solving production scheduling with earliness/tardiness penalties by constraint programming [J].
Jan Kelbel ;
Zdeněk Hanzálek .
Journal of Intelligent Manufacturing, 2011, 22 :553-562
[35]   Efficient algorithms for machine scheduling problems with earliness and tardiness penalties [J].
Guang Feng ;
Hoong Chuin Lau .
Annals of Operations Research, 2008, 159 :83-95
[36]   OPTIMAL SINGLE-MACHINE SCHEDULING WITH EARLINESS AND TARDINESS PENALTIES [J].
SIDNEY, JB .
OPERATIONS RESEARCH, 1977, 25 (01) :62-69
[37]   Solving production scheduling with earliness/tardiness penalties by constraint programming [J].
Kelbel, Jan ;
Hanzalek, Zdenek .
JOURNAL OF INTELLIGENT MANUFACTURING, 2011, 22 (04) :553-562
[38]   Efficient algorithms for machine scheduling problems with earliness and tardiness penalties [J].
Feng, Guang ;
Lau, Hoong Chuin .
ANNALS OF OPERATIONS RESEARCH, 2008, 159 (01) :83-95
[39]   Earliness/tardiness scheduling for single machine with sequence dependent setup times [J].
Kim, Minsoo ;
Seo, Wonchul ;
Koh, Shiegheun .
ICIC Express Letters, 2015, 9 (12) :3313-3319
[40]   An earliness and tardiness stochastic scheduling problem on a batch processor [J].
Zhang, Li-Hua ;
Tu, Feng-Sheng .
Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2005, 25 (10) :114-119