Exploring a production-inventory model with optimal reliability of the production in a parallel-series system

被引:6
作者
Maji, Anushri [1 ]
Bhunia, Asoke Kumar [2 ]
Mondal, Shyamal Kumar [1 ]
机构
[1] Vidyasagar Univ, Dept Appl Math Oceanol & Comp Programming, Midnapore 721102, WB, India
[2] Univ Burdwan, Dept Math, Burdwan, W Bengal, India
关键词
Production-reliability-inventory system; multi-objective optimization; optimal components and cycles; reliability and selling price-dependent demand; reliability-dependent production cost; REDUNDANCY ALLOCATION PROBLEM; VENDOR MANAGED INVENTORY; OPTIMIZATION; LEVEL;
D O I
10.1080/21681015.2020.1733109
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this study, a production-reliability-inventory system has been formulated and discussed. Here, different types of components, i.e., raw materials are purchased from a supplier in some cycles of equal length. Purchased raw materials have been stored in a warehouse and used in a parallel-series system to produce items with system reliability dependent production cost. Also, the demand rate of the items has been considered to be linearly dependent on reliability and selling price of those items. The main goal of this study is to find the optimal number of transportation cycles and components, which maximize the total business profit and system reliability with volume, weight and cost of the system as constraints. Multi-objective genetic algorithm (MOGA) has been applied to solve the proposed problem. A numerical example has discussed that how this model is applicable in real life situations. Finally, some sensitivity analyses have been performed to study the model.
引用
收藏
页码:71 / 86
页数:16
相关论文
共 50 条
  • [31] A discrete approach to designing optimal hedging-point control policies for production-inventory systems with general stochastic behavior
    Khoury B.N.
    Computational Management Science, 2009, 6 (4) : 399 - 409
  • [32] Analytical approach for optimal solution of inventory model with constrained production capacity
    Yang, Gino K.
    CONCURRENT ENGINEERING-RESEARCH AND APPLICATIONS, 2015, 23 (01): : 74 - 80
  • [33] An EPQ model to study the parallel production of two items in a multistage production system
    Bhattacharjee, Nabajyoti
    Nath, Biman Kanti
    Malakar, Sanjukta
    Sen, Nabendu
    Shah, Nita H.
    Mittal, Mandeep
    INTERNATIONAL JOURNAL OF SYSTEM ASSURANCE ENGINEERING AND MANAGEMENT, 2024, 15 (12) : 5484 - 5496
  • [34] Decision process for multiobjective, multi-item production-inventory system via interactive fuzzy satisficing technique
    Mahapatra, NK
    Maiti, M
    COMPUTERS & MATHEMATICS WITH APPLICATIONS, 2005, 49 (5-6) : 805 - 821
  • [35] A Production Model for Deteriorating Inventory Items with Production Disruptions
    He, Yong
    He, Ju
    DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2010, 2010 : 1 - 14
  • [36] A VENDOR-MANAGED INVENTORY MODEL BASED ON OPTIMAL RETAILERS SELECTION AND RELIABILITY OF SUPPLY CHAIN
    Modares, Azam
    Farimani, Nasser Motahari
    Emroozi, Vahideh Bafandegan
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2023, 19 (05) : 3075 - 3106
  • [37] Model and solution approach to coordinate production-inventory strategies considering nonlinear price-sensitive demand: application to Canadian pulp and paper industry
    Ghasemi, Elaheh
    Lehoux, Nadia
    Ronnqvist, Mikael
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2024, 62 (19) : 6903 - 6932
  • [38] Multi-objective particle swarm optimisation approach for production-inventory control systems
    AL-Khazraji, Huthaifa
    Cole, Colin
    Guo, William
    JOURNAL OF MODELLING IN MANAGEMENT, 2018, 13 (04) : 1037 - 1056
  • [39] A VENDOR-MANAGED INVENTORY MODEL BASED ON OPTIMAL RETAILERS SELECTION AND RELIABILITY OF
    Modares, Azam
    Farimani, Nasser Motahari
    Emroozi, Vahideh Bafandegan
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2022,
  • [40] EOQ and EPQ Production-Inventory Models with Variable Holding Cost: State-of-the-Art Review
    Alfares, Hesham K.
    Ghaithan, Ahmed M.
    ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2019, 44 (03) : 1737 - 1755