Queueing Model Improves IBM's Semiconductor Capacity and Lead-Time Management

被引:21
作者
Brown, Steven M. [1 ]
Hanschke, Thomas [2 ]
Meents, Ingo [3 ]
Wheeler, Benjamin R. [4 ]
Zisgen, Horst [3 ]
机构
[1] IBM Syst & Technol Grp, Hopewell Jct, NY 12533 USA
[2] Clausthal Univ Technol, Dept Math, Clausthal Zellerfeld, Germany
[3] IBM Deutschland Res & Dev GmbH, Mainz, Germany
[4] MIT Sloan Sch Management, Cambridge, MA 02142 USA
关键词
queueing networks; linear programming; semiconductors; manufacturing management; capacity planning; lead-time planning; NETWORK MODEL; CYCLE TIME;
D O I
10.1287/inte.1100.0516
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
At IBM's 300 mm semiconductor plant in East Fishkill, New York, we developed and implemented the Enterprise Production Planning and Optimization System (EPOS), an advanced queueing network model for capacity planning. EPOS extends earlier queueing network models by adding the ability to model product-specific batch service and batch arrivals and multichamber process equipment, and by embedding a linear program for allocating lots to the right queues when route choices are present. EPOS addresses both short-term tactical capacity planning and long-term strategic capital investment planning. It has become an integral part of predicting factory bottlenecks, prioritizing continuous-improvement efforts, planning capital equipment investments, and managing factory lead times. EPOS results have guided IBM's efforts to improve factory performance and reduce tens of millions of dollars of expense.
引用
收藏
页码:397 / 407
页数:11
相关论文
共 15 条
[1]  
[Anonymous], 1990, Probability, statistics, and queuing theory
[2]   Capacity optimization planning system (CAPS) [J].
Bermon, S ;
Hood, SJ .
INTERFACES, 1999, 29 (05) :31-49
[3]  
BULKELEY WM, 2008, WALL STREET J 0716
[4]   A queueing network model for semiconductor manufacturing [J].
Connors, DP ;
Feigin, GE ;
Yao, DD .
IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 1996, 9 (03) :412-427
[5]  
GAVER DP, 1962, J ROY STAT SOC B, V24, P73
[6]   A review on strategic capacity planning for the semiconductor manufacturing industry [J].
Geng, Na ;
Jiang, Zhibin .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2009, 47 (13) :3639-3655
[7]   Approximations for the mean queue length of the GIX/G(b,b)/c queue [J].
Hanschke, T .
OPERATIONS RESEARCH LETTERS, 2006, 34 (02) :205-213
[8]   Using an optimized queueing network model to support wafer fab design [J].
Hopp, WJ ;
Spearman, ML ;
Chayet, S ;
Donohue, KL ;
Gel, ES .
IIE TRANSACTIONS, 2002, 34 (02) :119-130
[9]   APPROXIMATE ANALYSIS OF GENERAL QUEUING NETWORKS BY DECOMPOSITION [J].
KUEHN, PJ .
IEEE TRANSACTIONS ON COMMUNICATIONS, 1979, 27 (01) :113-126
[10]   SLIM: Short cycle time and low inventory in manufacturing at Samsung Electronics [J].
Lee, YW .
INTERFACES, 2002, 32 (01) :77-77