Lightweight collaborative activity patterns in project management

被引:0
|
作者
Zhang, Shaoke [1 ]
Zhao, Chen [1 ]
Moody, Paul [2 ]
Liao, Qinying [1 ]
Zhang, Qiang [1 ]
机构
[1] IBM China Res Lab, Bldg 19 Zhongguancun Software Pk, Beijing 100094, Peoples R China
[2] IBM Cambridge Lab, Cambridge, MA 02142 USA
来源
ENGINEERING PSYCHOLOGY AND COGNITIVE ERGONOMICS, PROCEEDINGS | 2007年 / 4562卷
关键词
fragmented activity; activity threads; project management;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
People working with ad-hoe collaboration tools suffer from information overload and information scatter. Our five-month study of project managers found their work comprised of fragmented activities scattering in task, people and application. However, these loosely coupled collaborative activities were implicitly organized by hierarchical activity threads through intrusion and digression, and geared into work breakdown structure (WBS) in high level. Our investigation gives implications on making people's work manageable as well as flexible, by integrating lightweight collaborative activities with centralized processes.
引用
收藏
页码:465 / +
页数:3
相关论文
共 50 条
  • [31] Collaborative project information management in a semantic web environment
    Anumba, C.
    Pan, J.
    Issa, R.
    Mutis, I.
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2008, 15 (01) : 78 - +
  • [32] A Simulation Study of Project Management and Collaborative Information Technologies
    Natu, Amol Anant
    Kennedy, Deanna M.
    AMCIS 2012 PROCEEDINGS, 2012,
  • [33] Collaborative Project Management Framework for Partner Network Initiation
    Shevtshenko, Eduard
    Poljantchikov, Igor
    Mahmooda, Kashif
    Kangilasski, Taivo
    Norta, Alexander
    25TH DAAAM INTERNATIONAL SYMPOSIUM ON INTELLIGENT MANUFACTURING AND AUTOMATION, 2014, 2015, 100 : 159 - 168
  • [34] Project management in multi-disciplinary collaborative research
    Lloyd, S
    Simpson, A
    2005 IEEE International Professional Communication Conference (IPCC), 2005, : 602 - 611
  • [35] A distributed Project management framework for collaborative product development
    Zhang, ST
    Yang, JJ
    Wu, XL
    PROGRESS OF MACHINING TECHNOLOGY: WITH SOME TOPICS IN ADVANCED MANUFACTURING TECHNOLOGY, 2002, : 972 - 976
  • [36] Integrated E-project Collaborative Management System
    Kemavuthanon, Kemachart
    2017 9TH INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY AND ELECTRICAL ENGINEERING (ICITEE), 2017,
  • [37] Lightweight Enhanced Collaborative Key Management Scheme For Smart Home Application
    Naoui, Sarra
    Elhdhili, Mohamed Elhoucine
    Saidane, Leila Azouz
    2017 INTERNATIONAL CONFERENCE ON HIGH PERFORMANCE COMPUTING & SIMULATION (HPCS), 2017, : 777 - 784
  • [38] CoMPARA: Collaborative Modeling Project for Androgen Receptor Activity
    Mansouri, Kamel
    Kleinstreuer, Nicole
    Abdelaziz, Ahmed M.
    Alberga, Domenico
    Alves, Vinicius M.
    Andersson, Patrik L.
    Andrade, Carolina H.
    Bai, Fang
    Balabin, Ilya
    Ballabio, Davide
    Benfenati, Emilio
    Bhhatarai, Barun
    Boyer, Scott
    Chen, Jingwen
    Consonni, Viviana
    Farag, Sherif
    Fourches, Denis
    Garcia-Sosa, Alfonso T.
    Gramatica, Paola
    Grisoni, Francesca
    Grulke, Chris M.
    Hong, Huixiao
    Horvath, Dragos
    Hu, Xin
    Huang, Ruili
    Jeliazkova, Nina
    Li, Jiazhong
    Li, Xuehua
    Liu, Huanxiang
    Manganelli, Serena
    Mangiatordi, Giuseppe F.
    Maran, Uko
    Marcou, Gilles
    Martin, Todd
    Muratov, Eugene
    Dac-Trung Nguyen
    Nicolotti, Orazio
    Nikolov, Nikolai G.
    Norinder, Ulf
    Papa, Ester
    Petitjean, Michel
    Piir, Geven
    Pogodin, Pavel
    Poroikov, Vladimir
    Qiao, Xianliang
    Richard, Ann M.
    Roncaglioni, Alessandra
    Ruiz, Patricia
    Rupakheti, Chetan
    Sakkiah, Sugunadevi
    ENVIRONMENTAL HEALTH PERSPECTIVES, 2020, 128 (02)
  • [39] Improving cross-company project management performance with a collaborative project scorecard
    Niebecker, Klaus
    Eager, David
    Kubitza, Klaus
    INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2008, 1 (03) : 368 - 386
  • [40] Evaluation on Collaborative Satisfaction for Project Management Team in Integrated Project Delivery Mode
    Zhang L.
    Li Y.
    Wu Q.
    Zhang, L. (tjzly126@126.com), 1600, Springer (94): : 109 - 115