Single-stage formulations for synchronised two-stage lot sizing and scheduling in soft drink production

被引:46
作者
Ferreira, Deisemara [1 ]
Clark, Alistair R. [2 ]
Almada-Lobo, Bernardo [3 ]
Morabito, Reinaldo [4 ]
机构
[1] Univ Fed Triangulo Mineiro, Dept Appl Math, Uberaba, Brazil
[2] Univ W England, Dept Engn Design & Math, Bristol BS16 1QY, Avon, England
[3] Univ Porto, Fac Engn, P-4100 Oporto, Portugal
[4] Univ Fed Sao Carlos, Dept Prod Engn, BR-13560 Sao Carlos, SP, Brazil
基金
巴西圣保罗研究基金会;
关键词
Production lot-scheduling models; Asymmetric travelling salesman problem; Soft drink industry; SEQUENCE-DEPENDENT SETUP; PARALLEL MACHINES; COSTS; MODELS; TIMES; OPPORTUNITIES; EXTENSIONS; ALGORITHMS;
D O I
10.1016/j.ijpe.2011.11.028
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This study deals with industrial processes that produce soft drink bottles in different flavours and sizes, carried out in two synchronised production stages: liquid preparation and bottling. Four single-stage formulations are proposed to solve the synchronised two-stage lot sizing and scheduling problem in soft drink production synchronising the first stage's syrup lots in tanks with the second stage's soft drink lots on bottling lines. The first two formulations are variants of the General Lot Sizing and Scheduling Problem (GLSP) with sequence-dependent setup times and costs, while the other two are based on the Asymmetric Travelling Salesman Problem (ATSP) with different subtour elimination constraints. All models are computationally tested and compared to the original two-stage formulation introduced in Ferreira et al. (2009), using data based on a real-world bottling plant. The results show not only the superiority of the single-stage models if compared to the two-stage formulation, but also the much faster solution times of the ATSP-based models. (C) 2011 Elsevier B.V. All rights reserved.
引用
收藏
页码:255 / 265
页数:11
相关论文
共 48 条
[1]   Production planning and scheduling in the glass container industry: A VNS approach [J].
Almada-Lobo, Bernardo ;
Oliveira, Jose F. ;
Carravilla, Maria Antonia .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 114 (01) :363-375
[2]   Single machine multi-product capacitated lot sizing with sequence-dependent setups [J].
Almada-Lobo, Bernardo ;
Klabjan, Diego ;
Carravilla, Maria Antonia ;
Oliveira, Jose F. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2007, 45 (20) :4873-4894
[3]   Synchronisation of scarce resources for a parallel machine lotsizing problem [J].
Almeder, Christian ;
Almada-Lobo, Bernardo .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (24) :7315-7335
[4]   Rolling-horizon and fix-and-relax heuristics for the parallel machine lot-sizing and scheduling problem with sequence-dependent set-up costs [J].
Beraldi, Patrizia ;
Ghiani, Gianpaolo ;
Grieco, Antonio ;
Guerriero, Emanuela .
COMPUTERS & OPERATIONS RESEARCH, 2008, 35 (11) :3644-3656
[5]   COMPUTATIONAL-COMPLEXITY OF THE CAPACITATED LOT SIZE PROBLEM [J].
BITRAN, GR ;
YANASSE, HH .
MANAGEMENT SCIENCE, 1982, 28 (10) :1174-1186
[6]   Lot sizing and scheduling: industrial extensions and research opportunities [J].
Clark, Alistair ;
Almada-Lobo, Bernardo ;
Almeder, Christian .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (09) :2457-2461
[7]   Production setup-sequencing and lot-sizing at an animal nutrition plant through atsp subtour elimination and patching [J].
Clark, Alistair R. ;
Morabito, Reinaldo ;
Toso, Eli A. V. .
JOURNAL OF SCHEDULING, 2010, 13 (02) :111-121
[8]   COMBINING PROCESS SELECTION AND LOT SIZING MODELS FOR PRODUCTION SCHEDULING OF ELECTROFUSED GRAINS [J].
Dale Luche, Jose Roberto ;
Morabito, Reinaldo ;
Pureza, Vitoria .
ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2009, 26 (03) :421-443
[9]   Lot sizing and furnace scheduling in small foundries [J].
de Araujo, Silvio A. ;
Arenales, Marcos N. ;
Clark, Alistair R. .
COMPUTERS & OPERATIONS RESEARCH, 2008, 35 (03) :916-932
[10]   Lot sizing and scheduling - Survey and extensions [J].
Drexl, A ;
Kimms, A .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 99 (02) :221-235