Scheduling identical parallel machines with tooling constraints

被引:64
作者
Beezao, Andreza Cristina [1 ]
Cordeau, Jean -Francois [2 ,3 ]
Laporte, Gilbert [2 ,4 ]
Yanasse, Horacio Hideki [5 ]
机构
[1] Univ Sao Paulo, Inst Ciencias Matemat & Comp, Sao Carlos, SP, Brazil
[2] CIRRELT, Montreal, PQ, Canada
[3] HEC Montreal, Canada Res Chair Logist & Transportat, Montreal, PQ, Canada
[4] HEC Montreal, Canada Res Chair Distribut Management, Montreal, PQ, Canada
[5] Univ Fed Sao Paulo, Inst Ciencia & Tecnol, Sao Jose Dos Campos, Brazil
基金
巴西圣保罗研究基金会;
关键词
Flexible manufacturing systems; Parallel machines; Sequence-dependent setup times; Tooling constraints; Adaptive large neighborhood search; FLEXIBLE MANUFACTURING SYSTEMS; SWITCHING PROBLEM; SETUP TIMES; PROGRAMMING APPROACH; GENETIC ALGORITHM; ALLOCATION; MODELS; OPTIMIZATION; MINIMIZATION; OPERATION;
D O I
10.1016/j.ejor.2016.08.008
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We model and solve the problem of sequencing a set of jobs with specified processing times and tool requirements on a set of identical parallel machines. Decisions concern the assignment of jobs to machines, their sequencing, and the allocation of tools on each machine. The objective function minimizes the makespan. We propose two mathematical formulations of the problem and an adaptive large neighborhood search metaheuristic in which the destroy and repair operators exploit the structures of two well-known and related combinatorial optimization problems, namely the parallel machine scheduling problem and the job sequencing and tool switching problem on a single machine. Computational experiments conducted on two data sets of 1440 instances show that our algorithm produces excellent results and outperforms existing heuristics. (C) 2016 Elsevier B.V. All rights reserved.
引用
收藏
页码:834 / 844
页数:11
相关论文
共 73 条
[1]   Joint job/tool scheduling in a flexible manufacturing cell with no on-board tool magazine [J].
Agnetis, A ;
Alfieri, A ;
Brandimarte, P ;
Prinsecchi, P .
COMPUTER INTEGRATED MANUFACTURING SYSTEMS, 1997, 10 (01) :61-68
[2]   A tabu search based algorithm for minimizing the number of tool switches on a flexible machine [J].
Al-Fawzan, MA ;
Al-Sultan, KS .
COMPUTERS & INDUSTRIAL ENGINEERING, 2003, 44 (01) :35-47
[3]   A survey of scheduling problems with setup times or costs [J].
Allahverdi, Ali ;
Ng, C. T. ;
Cheng, T. C. E. ;
Kovalyov, Mikhail Y. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) :985-1032
[4]   The third comprehensive survey on scheduling problems with setup times/costs [J].
Allahverdi, Ali .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 246 (02) :345-378
[5]  
Amaya JE, 2008, LECT NOTES COMPUT SC, V5296, P190, DOI 10.1007/978-3-540-88439-2_14
[6]  
[Anonymous], 1997, NEW LOCAL SEARCH ALG
[7]  
[Anonymous], 1979, Computers and Intractablity: A Guide to the Theory of NP-Completeness
[8]  
[Anonymous], ANN OPER RES
[9]   Auxiliary tool allocation in flexible manufacturing systems [J].
Atan, TS ;
Pandit, R .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 89 (03) :642-659
[10]  
Ayres R. U., 1988, MANUFACTURING REV, V1, P93