Influence of passive house technology on time and cost of construction investment

被引:2
作者
Apollo, Magdalena [1 ]
Miszewska-Urbanska, Emilia [1 ]
机构
[1] Gdansk Univ Technol, Dept Met Struct & Construct Management, Fac Civil & Environm Engn, Narutowicza 11-12 Str, PL-80233 Gdansk, Poland
来源
10TH CONFERENCE ON INTERDISCIPLINARY PROBLEMS IN ENVIRONMENTAL PROTECTION AND ENGINEERING EKO-DOK 2018 | 2018年 / 44卷
关键词
ENERGY;
D O I
10.1051/e3sconf/20184400004
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Due to the changes in the energy standards for housing in Poland there are many concerns. Is the standard required by the regulation achievable and if it is, then at what cost? There are many solutions to construct a building in line with the requirements of passive house technology. They are differentiated by price and time required for implementation. This study is based on the solution proposed by one of Polish companies, offering technologically integrated products allowing, according to the producer, to build passive houses faster and easier. The goal of this study was to confront producer's claim with reality by comparing time and cost of the same investment using conventional and passive house technology. The basis for time and cost analysis was a basic detached house design, partially modified with regards to materials and technology used. Conclusions of the study are based on the comparison of the two Gantt charts defined in Ms Project. Construction schedule was used to analyse the duration of both projects and the resources assignment was used in cost analysis.
引用
收藏
页数:8
相关论文
共 18 条
[1]  
A. Blomsterberg, 2009, EBDR0928 LUND U
[2]  
Anysz H., 2017, KONTROLA CZASOWO KOS
[3]   ANALYSIS OF THE INCREASE OF CONSTRUCTION COSTS IN URBAN REGENERATION PROJECTS [J].
Apollo, Magdalena ;
Miszewska-Urbanska, Emilia .
ADVANCES IN SCIENCE AND TECHNOLOGY-RESEARCH JOURNAL, 2015, 9 (28) :68-74
[4]   Economic analysis of passive houses and low-energy houses compared with standard houses [J].
Audenaert, A. ;
De Cleyn, S. H. ;
Vankerckhove, B. .
ENERGY POLICY, 2008, 36 (01) :47-55
[5]   The life cycle cost of a building from the point of view of environmental criteria of selecting the most beneficial offer in the area of competitive tendering [J].
Grzyl, Beata ;
Miszewska-Urbanska, Emilia ;
Apollo, Magdalena .
9TH CONFERENCE ON INTERDISCIPLINARY PROBLEMS IN ENVIRONMENTAL PROTECTION AND ENGINEERING (EKO-DOK 2017), 2017, 17
[6]   Building Information Modelling as an opportunity and risk for stakeholders involved in construction investment process [J].
Grzyl, Beata ;
Miszewska-Urbanska, Emilia ;
Apollo, Magdalena .
CREATIVE CONSTRUCTION CONFERENCE 2017, CCC 2017, 2017, 196 :1026-1033
[7]  
Ionescu GL, 2017, J APPL ENG SCI, V7, P23, DOI 10.1515/jaes-2017-0003
[8]  
Jarocka K., 2013, BUDYNKI NISKOENERGET, V3
[9]  
Kaczorek K., 2017, PRZEWODNIK PROJEKTAN, P6
[10]   Exploring transaction costs in passive house-oriented retrofitting [J].
Kiss, Bernadett .
JOURNAL OF CLEANER PRODUCTION, 2016, 123 :65-76