London Underground Limited are currently constructing an extension of the Jubilee Line. The approximately 16-km long Jubilee Line Extension Project connects the existing Green Park Underground Station with the Canary Wharf area and Greenwich. Being a part of the project, the London Bridge Station (Contract 104) was built using a combination of the New Austrian Tunneling Method (NATM) with Compensation Grouting. NATM was successfully applied in softground and urban areas under restrictive requirements regarding settlement limitation. Information on the flexibility of the method and the influence of Compensation Grouting on ground and tunnels are given.