Comparing the value of information sharing under different inventory policies in construction supply chain

被引:40
作者
Xue, Xiaolong [1 ]
Shen, Qiping [2 ]
Tan, Yongtao [2 ]
Zhang, Yu [3 ]
Fan, Hongqin [2 ]
机构
[1] Harbin Inst Technol, Sch Management, Dept Construct & Real Estate, Harbin 150001, Peoples R China
[2] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Kowloon, Hong Kong, Peoples R China
[3] Tianjin Inst Urban Construct, Dept Engn Management, Tianjin 300384, Peoples R China
基金
中国国家自然科学基金;
关键词
Information sharing; Value of information sharing; Construction supply chain; Inventory policy; AGENT-BASED CONSTRUCTION; DEMAND; MANAGEMENT; FRAMEWORK; INDUSTRY; SYSTEM; IMPACT; MODEL;
D O I
10.1016/j.ijproman.2011.04.003
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Measuring the value of information sharing (VIS) in different inventory policies can help general contractor to improve materials and equipments management in construction supply chain. The models for measuring the VIS under (s, S) and Periodic Review (PR) inventory policies are established. A method to compare the VIS is given in a two-level construction supply chain, which aims to measure the impacts of supply quantity information of materials on general contractor's service level and total inventory cost under different inventory policies. A numerical example is proposed to explore the gap of VIS between (s, S) and PR inventory policies in a rebar supply chain. The results show that general contractor's service level in (s, S) inventory is higher than PR's and total inventory cost in (s, S) inventory is lower than PR's in the case of no information sharing. In the case of information sharing, general contractor's service level in PR inventory policy is higher than (s, S) policy; however, it is implemented by the increase of total inventory cost. This research provides valuable information to help general contractor to make correct decision on inventory management in supply chain at firm-level. (C) 2011 Elsevier Ltd. and IPMA. All rights reserved.
引用
收藏
页码:867 / 876
页数:10
相关论文
共 40 条
[1]   Value stream analysis of a re-engineered construction supply chain [J].
Arbulu, RJ ;
Tommelein, ID ;
Walsh, KD ;
Hershauer, JC .
BUILDING RESEARCH AND INFORMATION, 2003, 31 (02) :161-171
[2]   OPTIMAL INVENTORY POLICY [J].
Arrow, Kenneth J. ;
Harris, Theodore ;
Marschak, Jacob .
ECONOMETRICA, 1951, 19 (03) :250-272
[3]   Supply chain inventory management and the value of shared information [J].
Cachon, GP ;
Fisher, M .
MANAGEMENT SCIENCE, 2000, 46 (08) :1032-1048
[4]   Supply chain optimization tool for purchasing decisions in B2B construction marketplaces [J].
Castro-Lacouture, D. ;
Medaglia, A. L. ;
Skibniewski, M. .
AUTOMATION IN CONSTRUCTION, 2007, 16 (05) :569-575
[5]   Quantifying the bullwhip effect in a simple supply chain: The impact of forecasting, lead times, and information [J].
Chen, F ;
Drezner, Z ;
Ryan, JK ;
Simchi-Levi, D .
MANAGEMENT SCIENCE, 2000, 46 (03) :436-443
[6]   Information Sharing and Order Variability Control Under a Generalized Demand Model [J].
Chen, Li ;
Lee, Hau L. .
MANAGEMENT SCIENCE, 2009, 55 (05) :781-797
[7]   A service oriented framework for construction supply chain integration [J].
Cheng, Jack C. P. ;
Law, Kincho H. ;
Bjornsson, Hans ;
Jones, Albert ;
Sriram, Ram .
AUTOMATION IN CONSTRUCTION, 2010, 19 (02) :245-260
[8]   A PERIODIC REVIEW, PRODUCTION PLANNING-MODEL WITH UNCERTAIN CAPACITY AND UNCERTAIN DEMAND - OPTIMALITY OF EXTENDED MYOPIC POLICIES [J].
CIARALLO, FW ;
AKELLA, R ;
MORTON, TE .
MANAGEMENT SCIENCE, 1994, 40 (03) :320-332
[9]   Behavioral causes of the bullwhip effect and the observed value of inventory information [J].
Croson, R ;
Donohue, K .
MANAGEMENT SCIENCE, 2006, 52 (03) :323-336
[10]   Collusion in the Dutch construction industry:: an industrial organization perspective [J].
Dorée, AG .
BUILDING RESEARCH AND INFORMATION, 2004, 32 (02) :146-156