Multi-ontology sense making - Decision making of project core team

被引:1
作者
Naaranoja, Marja [1 ]
机构
[1] Univ Vaasa, Wolffintie 34, Vaasa 65200, Finland
来源
6TH INTERNATIONAL CONFERENCE ON APPLIED HUMAN FACTORS AND ERGONOMICS (AHFE 2015) AND THE AFFILIATED CONFERENCES, AHFE 2015 | 2015年 / 3卷
关键词
Sense making; Decision making; Ontology; Project; Core team; Construction industry;
D O I
10.1016/j.promfg.2015.07.280
中图分类号
B84 [心理学]; C [社会科学总论]; Q98 [人类学];
学科分类号
03 ; 0303 ; 030303 ; 04 ; 0402 ;
摘要
In order to understand core team's management task this paper studies the landscape of the decision making of the construction project core team. This paper uses multi-ontology sense making framework developed by Snowden. The four described situation illustrate the use of this framework. Firstly, a project core team create a project plan -timetable and cost estimate, that is supposed to be followed (rules and order) when making investment decision. Secondly, a project core team uses the plan but since the plan cannot be followed due to an unexpected situation the team changes the plan by calculating an optimal solution. In other words the team uses heuristic thinking when they change the rule (heuristics and order). Thirdly, the design group guides the design process by rules to get information for designing new facilities (rules and un-order). Fourthly, there are situations when the stakeholders have different kind of opinions in crisis and team cannot follow the preset orderly way of working (heuristics and un-order). (C) 2015 The Authors. Published by Elsevier B.V.
引用
收藏
页码:611 / 617
页数:7
相关论文
共 18 条
  • [1] Akintoye A.S., 1997, INT J PROJ MANAG, V15, P31, DOI [10.1016/S0263-7863(96)00035-X, DOI 10.1016/S0263-7863(96)00035-X]
  • [2] Ancona D., 2012, HDB TEACHING LEADERS, P3, DOI DOI 10.5465/AMLE.2011.0007
  • [3] [Anonymous], 2007, INNOVATIVE LEADER IN
  • [4] [Anonymous], ROYAL COMMISSION PRO
  • [5] [Anonymous], AJATTELU JA KIELI
  • [6] Barnes M., 1988, International Journal of Project Management, V6, P69, DOI DOI 10.1016/0263-7863(88)90028-2
  • [7] Chems A., 1984, CONSTRUCTION MANAGEM, P177, DOI DOI 10.1080/01446198400000016
  • [8] A TRANSLATION APPROACH TO PORTABLE ONTOLOGY SPECIFICATIONS
    GRUBER, TR
    [J]. KNOWLEDGE ACQUISITION, 1993, 5 (02): : 199 - 220
  • [9] Toward a Trust-Based Construction Management
    Guerriero, Annie
    Kubicki, Sylvain
    Halin, Gilles
    [J]. COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2010, 25 (04) : 253 - 268
  • [10] Core Project Teams as an Organizational Approach for Projects and Their Management
    Kahkonen, Kalle
    Keinanen, Marko
    Naaranoja, Marja
    [J]. SELECTED PAPERS FROM THE 26TH IPMA (INTERNATIONAL PROJECT MANAGEMENT ASSOCIATION), WORLD CONGRESS, 2013, 74 : 369 - 376