Using auxiliary gas power for CCS energy needs in retrofitted coal power plants

被引:15
作者
Bashadi, Sarah O. [1 ]
Herzog, Howard J. [1 ]
机构
[1] MIT, Energy Initiat, Cambridge, MA 02139 USA
来源
10TH INTERNATIONAL CONFERENCE ON GREENHOUSE GAS CONTROL TECHNOLOGIES | 2011年 / 4卷
关键词
Carbon capture and sequestration; CCS; Post-combustion capture retrofits;
D O I
10.1016/j.egypro.2011.02.060
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Adding post-combustion capture technology to existing coal-fired power plants is being considered as a near-term option for mitigating CO2 emissions. To supply the thermal energy needed for CO2 capture, much of the literature proposes thermal integration of the existing coal plant's steam cycle with the capture process' stripper reboiler. This paper examines the option of using an auxiliary natural gas turbine plant to meet the energetic demands of carbon capture and compression. Three different auxiliary plant technologies were compared to integration for 90% capture from an existing, 500 MW supercritical coal plant. CO2 capture (via a monoethylamine (MEA) absorption process) and compression is simulated using Aspen Plus. Thermoflow software is used to simulate three gas plant technologies. In some circumstances, it is found that using an auxiliary natural gas turbine may make retrofits more attractive compared to using thermal integration. The most important factors affecting desirability of the auxiliary plant retrofit are the cost of natural gas, the full cost of integration, and the potential for sale of excess electricity. (C) 2011 Published by Elsevier Ltd.
引用
收藏
页码:1828 / 1834
页数:7
相关论文
共 13 条
  • [1] A Kothanadamaran, 2010, THESIS MIT CAMBRIDGE
  • [2] CO2 capture from power plants.: Part I.: A parametric study of the technical-performance based on monoethanolamine
    Abu-Zahra, Mohammad R. M.
    Schneiders, Leon H. J.
    Niederer, John P. M.
    Feron, Paul H. M.
    Versteeg, Geert F.
    [J]. INTERNATIONAL JOURNAL OF GREENHOUSE GAS CONTROL, 2007, 1 (01) : 37 - 46
  • [3] Alie CF, 2004, THESIS U WATERLOO
  • [4] Alstom Power Inc ABB Lummus Global Inc and American Electric Power Inc, 2001, PPL01CT09 ALST POW I
  • [5] [Anonymous], 2007, FUT COAL OPT CARB CO
  • [6] [Anonymous], 2009, INT EN OUTL 2009
  • [7] Bashadi S., 2010, THESIS MIT
  • [8] Energy Information Administration, 2009, ANN EN OUTL 2009
  • [9] L Romeo, 2008, APP THERMAL ENG, V28
  • [10] Assessing the value of CO2 capture ready in new-build pulverised coal-fired power plants in China
    Liang, Xi
    Reiner, David
    Gibbins, Jon
    Li, Jia
    [J]. INTERNATIONAL JOURNAL OF GREENHOUSE GAS CONTROL, 2009, 3 (06) : 787 - 792