Profit-Based Unit Commitment Problem Using PSO with Modified Dynamic Programming

被引:0
|
作者
Shukla, Anup [1 ]
Lal, Vivek Nandan [1 ]
Singh, S. N. [1 ]
机构
[1] Indian Inst Technol, Dept Elect Engn, Kanpur, Uttar Pradesh, India
来源
2015 18TH INTERNATIONAL CONFERENCE ON INTELLIGENT SYSTEM APPLICATION TO POWER SYSTEMS (ISAP) | 2015年
关键词
Competitive environment; profit-base unit commitment problem; dynamic programming; particle swarm optimization;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper proposes a hybrid approach utilizing particle swarm optimization along with dynamic programming to solve unit commitment problem based on the profit under the deregulated power market. In the deregulated market, power and reserve prices are important factors in the decision process for unit commitment scheduling and offer freedom to utilities to schedule their generators to produce less than predicted load as well as reserve to maximize their profit. To solve the profit based unit commitment problem (PBUCP), the model is divided into exterior and interior dependent sub problems, which are discrete and continuous, respectively. The proposed model helps GENCOs to make a decision, how much power and reserve that must be put up for sale in the market, and how to schedule generators in order to receive the maximum profit. GENCOs with 3 and 10 generating units are used to demonstrate the effectiveness of the proposed approach.
引用
收藏
页数:6
相关论文
共 50 条
  • [1] Swarm Intelligence to the Solution of Profit-Based Unit Commitment Problem with Emission Limitations
    D. Sam Harison
    T. Sreerengaraja
    Arabian Journal for Science and Engineering, 2013, 38 : 1415 - 1425
  • [2] Swarm Intelligence to the Solution of Profit-Based Unit Commitment Problem with Emission Limitations
    Harison, D. Sam
    Sreerengaraja, T.
    ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2013, 38 (06) : 1415 - 1425
  • [3] Application of Particle Swarm Optimization technique to a profit-based Unit Commitment problem
    Sriyanyong P.
    ICETC 2010 - 2010 2nd International Conference on Education Technology and Computer, 2010, 4 : V4160 - V4166
  • [4] A new profit-based unit commitment considering power and reserve generating
    Attaviriyanupap, P
    Kita, H
    Tanaka, E
    Hasegawa, J
    2002 IEEE POWER ENGINEERING SOCIETY WINTER MEETING, VOLS 1 AND 2, CONFERENCE PROCEEDINGS, 2002, : 1311 - 1316
  • [5] Unit Commitment Problem Using An Efficient PSO Based Algorithm
    Zhai, Yu
    Mu, Nankun
    Liao, Xiaofeng
    Le, Junqing
    Huang, Tingwen
    2019 ELEVENTH INTERNATIONAL CONFERENCE ON ADVANCED COMPUTATIONAL INTELLIGENCE (ICACI 2019), 2019, : 320 - 324
  • [6] Solution to profit based unit commitment problem using particle swarm optimization
    Raglend, I. Jacob
    Raghuveer, C.
    Avinash, G. Rakesh
    Padhy, N. P.
    Kothari, D. P.
    APPLIED SOFT COMPUTING, 2010, 10 (04) : 1247 - 1256
  • [7] Fuzzy and simulated annealing based dynamic programming for the unit commitment problem
    Patra, S.
    Goswami, S. K.
    Goswami, B.
    EXPERT SYSTEMS WITH APPLICATIONS, 2009, 36 (03) : 5081 - 5086
  • [8] Solution for Multi-area Unit Commitment Problem Using PSO-Based Modified Firefly Algorithm
    Prabakaran, Samikkannu
    Tamilselvi, Selvaraj
    Raj, Perianayagam Ajay-D-Vimal
    Sudhakaran, Mahalingam
    Rajasekar, Selvamuthukumaran
    ADVANCES IN SYSTEMS, CONTROL AND AUTOMATION, 2018, 442 : 625 - 636
  • [9] Binary fireworks algorithm for profit based unit commitment (PBUC) problem
    Reddy, K. Srikanth
    Panwar, Lokesh Kumar
    Kumar, Rajesh
    Panigrahi, B. K.
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2016, 83 : 270 - 282
  • [10] Improved PSO Approach for The Solution of Unit Commitment Problem
    Guo, Y. R.
    Wu, Y. H.
    Zhang, J. R.
    Ren, J. D.
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE AND INDUSTRIAL ENGINEERING (AIIE 2015), 2015, 123 : 510 - 513