7-Score Function for Assessing the Strength of Association Rules Applied for Construction Risk Quantifying

被引:4
作者
Anysz, Hubert [1 ]
Roslon, Jerzy [1 ]
Foremny, Andrzej [1 ]
机构
[1] Warsaw Univ Technol, Inst Bldg Engn, Fac Civil Engn, Dept Prod Engn & Construct Management, PL-00637 Warsaw, Poland
来源
APPLIED SCIENCES-BASEL | 2022年 / 12卷 / 02期
关键词
association analysis; tabu search; delay; risk; construction project; PROJECTS; MANAGEMENT; OPTIMIZATION; CRITERIA; SYSTEM;
D O I
10.3390/app12020844
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
There are several factors influencing the time of construction project execution. The properties of the planned structure, the details of an order, and macroeconomic factors affect the project completion time. Every construction project is unique, but the data collected from previously completed projects help to plan the new one. The association analysis is a suitable tool for uncovering the rules-showing the influence of some factors appearing simultaneously. The input data to the association analysis must be preprocessed-every feature influencing the duration of the project must be divided into ranges. The number of features and the number of ranges (for each feature) create a very complicated combinatorial problem. The authors applied a metaheuristic tabu search algorithm to find the acceptable thresholds in the association analysis, increasing the strength of the rules found. The increase in the strength of the rules can help clients to avoid unfavorable sets of features, which in the past-with high confidence-significantly delayed projects. The new 7-score method can be used in various industries. This article shows its application to reduce the risk of a road construction contract delay. Importantly, the method is not based on expert opinions, but on historical data.
引用
收藏
页数:23
相关论文
共 50 条
[1]   COMPREHENSIVE RISK MANAGEMENT USING FUZZY FMEA AND MCDA TECHNIQUES IN HIGHWAY CONSTRUCTION PROJECTS [J].
Ahmadi, Mohsen ;
Behzadian, Kourosh ;
Ardeshir, Abdollah ;
Kapelan, Zoran .
JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2017, 23 (02) :300-310
[2]  
Ahmed AM, 2015, ACTA PHYS POL A, V128, pB324, DOI [10.12693/APhysPolA.128.B-324, 10.12693/APhysPolA.127.B-324]
[3]   Identifying factors and conditions contributing to cyclists' serious accidents with the use of association analysis [J].
Anysz, H. ;
Wlodarek, P. ;
Olszewski, P. ;
Cafiso, S. .
ARCHIVES OF CIVIL ENGINEERING, 2021, 67 (03) :197-211
[4]   The association analysis for risk evaluation of significant delay occurrence in the completion date of construction project [J].
Anysz, H. ;
Buczkowski, B. .
INTERNATIONAL JOURNAL OF ENVIRONMENTAL SCIENCE AND TECHNOLOGY, 2019, 16 (09) :5369-5374
[5]  
Anysz H., 2017, THESIS OFICYNA WYDAW, DOI [10.13140/RG.2.2.14129.68960, DOI 10.13140/RG.2.2.14129.68960]
[6]   Quantitative Risk Assessment in Construction Disputes Based on Machine Learning Tools [J].
Anysz, Hubert ;
Apollo, Magdalena ;
Grzyl, Beata .
SYMMETRY-BASEL, 2021, 13 (05)
[7]   Managing Delays in Construction Projects Aiming at Cost Overrun Minimization [J].
Anysz, Hubert .
4TH WORLD MULTIDISCIPLINARY CIVIL ENGINEERING-ARCHITECTURE-URBAN PLANNING SYMPOSIUM - WMCAUS, 2019, 603
[8]   Comparison of ANN Classifier to the Neuro-Fuzzy System for Collusion Detection in the Tender Procedures of Road Construction Sector [J].
Anysz, Hubert ;
Foremny, Andrzej ;
Kulejewski, Janusz .
3RD WORLD MULTIDISCIPLINARY CIVIL ENGINEERING, ARCHITECTURE, URBAN PLANNING SYMPOSIUM (WMCAUS 2018), 2019, 471
[9]  
Atluri G, 2009, LECT N BIOINFORMAT, V5462, P1, DOI 10.1007/978-3-642-00727-9_1
[10]   Development of a Pragmatic IT Concept for a Construction Company [J].
Bode, Klaus ;
Rozycka, Agata ;
Nowak, Pawel .
SUSTAINABILITY, 2020, 12 (17)