Long-term distribution network expansion planning by network reconfiguration and generation of construction plans

被引:47
作者
Asakura, T [1 ]
Genji, T
Yura, T
Hayashi, N
Fukuyama, Y
机构
[1] Kansai Elect Power Co Inc, Tech Res Ctr, Amagasaki, Hyogo 6610974, Japan
[2] Fuji Elect Corp Ltd, Corp Technol Dev Off, Tokyo 1918502, Japan
关键词
construction plans; distribution network expansion planning; modern heuristic technique; network reconfiguration; search method; three phase unbalanced load flow calculation;
D O I
10.1109/TPWRS.2003.811170
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper proposes a distribution network expansion planning method by network reconfiguration and generation of construction plans. Considering natural growth of electric loads and installation of new large customers, the method first tries to reconfigure the target network by changing switch status for loss minimization and analyzing security of the target network by contingency analysis. If operational constraints are violated even in the reconfigured network, the method tries to generate construction plan candidates, which can eliminate the operational constraint violations. The proposed method handles long-term yearly load increase and generates the best network expansion plans, namely, the best network reconfiguration and construction plans for each year of the target term. The proposed method is verified by comparing construction plans generated by the proposed method with the actual plan composed by experienced planning persons in distribution control centers. It is found that the proposed method can generate the same plans generated by the experienced persons. Moreover, the method can generate various alternative construction plan candidates. The results indicate the practical applicability of the proposed distribution network expansion planning method.
引用
收藏
页码:1196 / 1204
页数:9
相关论文
共 16 条
[1]   NEW APPROXIMATE OPTIMIZATION METHOD FOR DISTRIBUTION-SYSTEM PLANNING [J].
AOKI, K ;
NARA, K ;
SATOH, T ;
KITAGAWA, M ;
YAMANAKA, K .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1990, 5 (01) :126-132
[2]  
Battiti R., 1994, ORSA Journal on Computing, V6, P126, DOI 10.1287/ijoc.6.2.126
[3]  
CARVALHO PMS, 1996, P 12 POW SYST COMP C
[4]  
DONGARRA J, 1993, PMV 3 USERS GUIDE RE
[5]  
FERREIRA LM, 1998, TRANSMISSION DIS OCT
[6]  
FUDOU H, 1997, P IEEE INT SYST APPL
[7]  
GENJI T, 2002, T I ELECT ENG JAPA B, V122
[8]  
GENJI T, 1999, P IEEE INT SYST APPL
[9]  
GENJI T, 2001, P IEEE POW ENG SOC S
[10]  
Gropp W., 1994, USING MPI