共 58 条
[2]
Akinsiku E.O., 2011, J BUILD APPRAIS, V6, P315, DOI [10.1057/jba.2011.9, DOI 10.1057/JBA.2011.9]
[3]
Al-Momani A., 1996, Construction Management and Economics, V14, P311, DOI [10.1080/014461996373386, DOI 10.1080/014461996373386]
[4]
[Anonymous], 1993, An introduction to the bootstrap
[5]
[Anonymous], 1996, APPL MULTIVARIATE TE
[6]
Ashworth Allan., 1999, COST STUDIES BUILDIN
[7]
Predicting cost deviation in reconstruction projects: Artificial neural network versus regression
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
2003, 129 (04)
:405-411
[8]
CafeLand, RES BUILD PROJ
[9]
CBRE, RES