Optimisation of the Construction Plan of Assembled Concrete Structures in Other Courtyard Buildings Based on Grey Clustering

被引:0
作者
Chen, M. [1 ]
Feng, Y. L. [2 ]
Kong, W. L. [1 ]
机构
[1] Anhui Tech Coll Ind & Econ, Hefei 230051, Anhui, Peoples R China
[2] Hefei Univ Technol, Hefei 230009, Anhui, Peoples R China
来源
ELECTRONIC JOURNAL OF STRUCTURAL ENGINEERING | 2022年 / 22卷 / 03期
关键词
KEYWORDS; Grey clustering; Assembled buildings; Concrete structures; Construction solutions;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The assembled concrete structure is a common construction solution in the current building industry, and it is debatable how to further improve the construction efficiency of the pointed claw assembled concrete structure. The study proposes a grey clustering method based on the improved OWA operator as a means to obtain more effective construction evaluation indicators. In performance tests, it was shown that the grey clustering method under the OWA operator optimisation is more capable of computing features for large amounts of data than traditional grey clustering, with an execution time of less than 200s. In the application tests of the construction scheme, the study showed that the proposed optimisation scheme has a more effective safety evaluation, shorter construction period and lower resource consumption. These results show that the use of grey clustering is effective in optimising the construction of assembled concrete structures, and that the optimised solutions show better reduction in construction time and resource utilisation than traditional construction solutions, so that the rational use of grey clustering in assembled buildings will help the construction industry to achieve greater efficiency in construction.
引用
收藏
页码:38 / 46
页数:9
相关论文
共 20 条
[1]   Empirical study of neighbourhood rough sets based band selection techniques for classification of hyperspectral images [J].
Barman, Barnali ;
Patra, Swarnajyoti .
IET IMAGE PROCESSING, 2019, 13 (08) :1266-1279
[2]   Model for planning and controlling the delivery and assembly of engineer-to-order prefabricated building systems: exploring synergies between Lean and BIM [J].
Bataglin, Fernanda S. ;
Viana, Daniela D. ;
Formoso, Carlos T. ;
Bulhoes, Iamara R. .
CANADIAN JOURNAL OF CIVIL ENGINEERING, 2020, 47 (02) :165-177
[3]   Site logistics planning and control for engineer-to-order prefabricated building systems using BIM 4D modeling [J].
Bortolini, Rafaela ;
Formoso, Carlos Torres ;
Viana, Daniela D. .
AUTOMATION IN CONSTRUCTION, 2019, 98 :248-264
[4]   Volatility GARCH models with the ordered weighted average (OWA) operators [J].
Flores-Sosa, Martha ;
Aviles-Ochoa, Ezequiel ;
Merigo, Jose M. ;
Yager, Ronald R. .
INFORMATION SCIENCES, 2021, 565 :46-61
[5]   A Comprehensive Evaluation Method of Sensor Selection for PHM Based on Grey Clustering [J].
Guan, Fei ;
Cui, Wei-Wei ;
Li, Lian-Feng ;
Wu, Jie .
SENSORS, 2020, 20 (06)
[7]   A new two-stage grey evaluation decision-making method for interval grey numbers [J].
Li, Peng ;
Wei, Cuiping .
KYBERNETES, 2018, 47 (04) :801-815
[8]   Cluster analysis as a tool for evaluating the exploration potential of Known Geothermal Resource Areas [J].
Lindsey, Cary R. ;
Neupane, Ghanashym ;
Spycher, Nicolas ;
Fairley, Jerry P. ;
Dobson, Patrick ;
Wood, Thomas ;
McLing, Travis ;
Conrad, Mark .
GEOTHERMICS, 2018, 72 :358-370
[9]   Three way decisions based grey incidence analysis clustering approach for panel data and its application [J].
Liu, Yong ;
Du, Jun-liang ;
Zhang, Ren-Shi ;
Forrest, Jeffrey Yi-Lin .
KYBERNETES, 2019, 48 (09) :2117-2137
[10]   Segmentation and clustering in brain MRI imaging [J].
Mirzaei, Golrokh ;
Adeli, Hojjat .
REVIEWS IN THE NEUROSCIENCES, 2019, 30 (01) :31-44