共 32 条
- [1] ADAM NR, 1980, MANAGE SCI, V26, P1127
- [2] THE SHIFTING BOTTLENECK PROCEDURE FOR JOB SHOP SCHEDULING [J]. MANAGEMENT SCIENCE, 1988, 34 (03) : 391 - 401
- [3] [Anonymous], 1986, GOAL PROCESS ONGOING
- [4] [Anonymous], 1979, Computers and Intractablity: A Guide to the Theoryof NP-Completeness
- [6] Baptiste P., 1993, Production Planning and Control, V4, P349, DOI 10.1080/09537289308919457
- [8] BHASKARAN K, 1991, HDB IND ENG, pCH83