Comparison and Selection of Western Expressway's Project Financing Approaches based on AHP

被引:0
作者
Gao, Ying [1 ]
Cao, Ning [1 ]
Luo, Xiaodong [2 ]
机构
[1] Xijing Univ, Xian, Shaanxi, Peoples R China
[2] Xian Municipal Engn Design & Res Inst Co Ltd, Xian, Shaanxi, Peoples R China
来源
PROCEEDINGS OF 2014 3RD INTERNATIONAL CONFERENCE ON PHYSICAL EDUCATION AND SOCIETY MANAGEMENT (ICPESM 2014), VOL 22 | 2014年 / 22卷
关键词
Expressway; Financing Approach; Fuzzy Analytic Hierarchy Process; Evaluation Indicator;
D O I
暂无
中图分类号
G40 [教育学];
学科分类号
040101 ; 120403 ;
摘要
The development of expressway has a pivotal significance for the growth of economy in China's western regions, the funds financing channels of China's expressway construction have undergone continuous changes, the selection of financing approach is an issue needed to be carefully considered by the initiator of the project. The basic features of project financing and several common used financing patterns of expressway are first discussed in this paper, on the basis, using the fuzzy AHP integrating qualitative analysis with quantitative analysis to build the comparison and selection model of expressway's project financing approaches from four aspects of financing cost, financing risk, financing amount, financing time, the detailed comparison and selection process and procedures are also presented in this paper.
引用
收藏
页码:144 / 149
页数:6
相关论文
共 6 条
[1]  
Chen Jinhua, 2012, SCI TECHNOLOGY INFOR
[2]  
Lei Dingyou, 2011, STAT DECISION
[3]  
Sun Hui, 2011, STAT DECISION
[4]  
Wang Dengxiao, 2010, PROJECT MANAGEMENT T
[5]  
WANG L, 2006, VALUE ENG
[6]  
Xia Liming, 2010, CONSTRUCTION EC