Enhanced Subcontractors Allocation for Apartment Construction Project Applying Conceptual 4D Digital Twin Framework

被引:8
作者
Kim, Woong-Gi [1 ]
Ham, Namhyuk [2 ]
Kim, Jae-Jun [1 ]
机构
[1] Hanyang Univ, Dept Architectural Engn, 222 Wangsimni Ro, Seoul 04763, South Korea
[2] Hanyang Cyber Univ, Dept Digital Architecture & Urban Engn, 220 Wangsimni Ro, Seoul 04763, South Korea
基金
新加坡国家研究基金会;
关键词
resource allocation; BIM; queue model; digital twin; RESOURCE-ALLOCATION; TIME; MODEL; SYSTEM; QUEUES; DESIGN;
D O I
10.3390/su132111784
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The problem of optimal allocation of resources in limited circumstances to handle assigned tasks has been dealt with in a wide variety of research fields. Various research methodologies have been proposed to address uncertainties such as waiting and waste in construction projects, but they do not take into account the complexity of construction production systems. In this study, a research approach was proposed that simplified the construction production system into a work package to be serviced and a work group to provide services. In addition, a conceptual 4D digital twin framework considering the uncertainty of the construction production system was proposed. This framework includes BIM as an information model and a queuing model as a decision-making model. Through case projects, we have presented how this framework can be used for decision making in several statuses. As a result of the analysis using the performance index of the queuing model, it was possible to monitor the status of the system according to the allocation of resources. In addition, it was possible to confirm the improvement of the performance index according to the additional arrangement of the work group and the activity cycle of the work package. The framework presented in this study helps to quantitatively analyze the state of the system according to the input data based on empirical knowledge, but it has a limitation in that it cannot present an optimized resource allocation solution. Therefore, in future research, it is necessary to consider the grafting of machine learning technology that can provide optimal solutions by solving complex decision-making problems.
引用
收藏
页数:21
相关论文
共 66 条
  • [1] BOOKBINDER JH, 1986, INFOR, V24, P280
  • [2] BOOKBINDER JH, 1979, INFOR, V17, P58
  • [3] Supporting constructability analysis meetings with Immersive Virtual Reality-based collaborative BIM 4D simulation
    Boton, Conrad
    [J]. AUTOMATION IN CONSTRUCTION, 2018, 96 : 1 - 15
  • [4] Construction Project Scheduling with Time, Cost, and Material Restrictions Using Fuzzy Mathematical Models and Critical Path Method
    Castro-Lacouture, Daniel
    Suer, Gursel A.
    Gonzalez-Joaqui, Julian
    Yates, J. K.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2009, 135 (10) : 1096 - 1104
  • [5] Analysing queueing at toll plazas using a coupled, multiple-queue, queueing system model: application to toll plaza design
    Chakroborty, Partha
    Gill, Rahul
    Chakraborty, Pranamesh
    [J]. TRANSPORTATION PLANNING AND TECHNOLOGY, 2016, 39 (07) : 675 - 692
  • [6] CHANG DY, 1986, THESIS U MICHIGAN AN
  • [7] Cheng E. W. L., 2001, Information Management & Computer Security, V9, P61, DOI 10.1108/09685220110388827
  • [8] Tool-wear prediction and pattern-recognition using artificial neural network and DNA-based computing
    D'Addona, Doriana M.
    Ullah, A. M. M. Sharif
    Matarazzo, D.
    [J]. JOURNAL OF INTELLIGENT MANUFACTURING, 2017, 28 (06) : 1285 - 1301
  • [9] Dynamic modelling of human resource allocation in construction projects
    Dabirian, Shahin
    Abbaspour, Soroush
    Khanzadi, Mostafa
    Ahmadi, Mostafa
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2019, : 182 - 191
  • [10] Building Information Modeling (BIM) application framework: The process of expanding from 3D to computable nD
    Ding, Lieyun
    Zhou, Ying
    Akinci, Burcu
    [J]. AUTOMATION IN CONSTRUCTION, 2014, 46 : 82 - 93