共 50 条
- [41] Due-date scheduling on parallel machines with job splitting and sequence-dependent major/minor setup times INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 59 (1-4): : 325 - 333
- [42] Scheduling hybrid flowshops with sequence dependent setup times to minimize makespan and maximum tardiness INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 41 (11-12): : 1186 - 1198