Minimising total tardiness for the identical parallel machine scheduling problem with splitting jobs and sequence-dependent setup times

被引:44
|
作者
Kim, Jae-Gon [1 ]
Song, Seokwoo [2 ]
Jeong, BongJoo [3 ]
机构
[1] Incheon Natl Univ, Dept Ind & Management Engn, Incheon, South Korea
[2] Weber State Univ, Dept Supply Chain & Management Informat Syst, Ogden, UT 84408 USA
[3] Hannam Univ, Dept Ind & Management Engn, Daejeon, South Korea
关键词
Identical parallel machine scheduling; total tardiness; job splitting; sequence-dependent setup time; solution encoding and decoding; simulated annealing; genetic algorithm; MAKESPAN MINIMIZATION; GENETIC ALGORITHM; BOUND ALGORITHM; ELIGIBILITY; SEARCH;
D O I
10.1080/00207543.2019.1672900
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper focuses on an identical parallel machine scheduling problem with minimising total tardiness of jobs. There are two major issues involved in this scheduling problem; (1) jobs which can be split into multiple sub-jobs for being processed on parallel machines independently and (2) sequence-dependent setup times between the jobs with different part types. We present a novel mathematical model with meta-heuristic approaches to solve the problem. We propose two encoding schemes for meta-heuristic solutions and three decoding methods for obtaining a schedule from the meta-heuristic solutions. Six different simulated annealing algorithms and genetic algorithms, respectively, are developed with six combinations of two encoding schemes and three decoding methods. Computational experiments are performed to find the best combination from those encoding schemes and decoding methods. Our findings show that the suggested algorithm provides not only better solution quality, but also less computation time required than the commercial optimisation solvers.
引用
收藏
页码:1628 / 1643
页数:16
相关论文
共 50 条
  • [21] Algorithms for the Unrelated Parallel Machine Scheduling Problem with Sequence Dependent Setup Times
    Silva, Luciano Geraldo
    Rego, Marcelo Ferreira
    de Assis, Luciana Pereira
    Andrade, Alessandro Vivas
    2018 37TH INTERNATIONAL CONFERENCE OF THE CHILEAN COMPUTER SCIENCE SOCIETY (SCCC), 2018,
  • [22] Solving single-machine total weighted tardiness problems with sequence-dependent setup times by meta-heuristics
    Shih-Wei Lin
    Kuo-Ching Ying
    The International Journal of Advanced Manufacturing Technology, 2007, 34 : 1183 - 1190
  • [23] Solving single-machine total weighted tardiness problems with sequence-dependent setup times by meta-heuristics
    Lin, Shih-Wei
    Ying, Kuo-Ching
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2007, 34 (11-12) : 1183 - 1190
  • [24] On the single machine scheduling problem with sequence-dependent setup times and periodic maintenance
    Krim, Hanane
    Benmansour, Rachid
    Duvivier, David
    2018 5TH INTERNATIONAL CONFERENCE ON CONTROL, DECISION AND INFORMATION TECHNOLOGIES (CODIT), 2018, : 374 - 378
  • [25] Scheduling hybrid flowshop with sequence-dependent setup times and due windows to minimize total weighted earliness and tardiness
    Khare, Ankit
    Agrawal, Sunil
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 135 : 780 - 792
  • [26] CONSTRAINT BASED SCHEDULING IN A GENETIC ALGORITHM FOR THE SINGLE MACHINE SCHEDULING PROBLEM WITH SEQUENCE-DEPENDENT SETUP TIMES
    Sioud, Aymen
    Gravel, Marc
    Gagne, Caroline
    ICEC 2010: PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON EVOLUTIONARY COMPUTATION, 2010, : 137 - 145
  • [27] Bicriteria scheduling of a two-machine flowshop with sequence-dependent setup times
    Mansouri, S. Afshin
    Hendizadeh, S. Hamed
    Salmasi, Nasser
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 40 (11-12) : 1216 - 1226
  • [28] Integrating sequence-dependent setup times and blocking in hybrid flow shop scheduling to minimize total tardiness
    Kurt, Atil
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2025, 16 (01) : 147 - 158
  • [29] An improved simulated annealing for hybrid flowshops with sequence-dependent setup and transportation times to minimize total completion time and total tardiness
    Naderi, B.
    Zandieh, M.
    Balagh, A. Khaleghi Ghoshe
    Roshanaei, V.
    EXPERT SYSTEMS WITH APPLICATIONS, 2009, 36 (06) : 9625 - 9633
  • [30] A genetic algorithm for fuzzy identical parallel machine scheduling of minimising total weighted tardiness under resource constraint
    Li, Kai
    Xu, Liping
    Zhang, Han
    Chen, Jianfu
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2024, 62 (21) : 7619 - 7643